SUBMITTALS <br />Section 01300 <br />15-1207 <br />5. Contain index of items submitted, properly identified with drawing numbers, etc. <br />6. Substitutions shall be accompanied by a completed Substitution Request Form <br />(included with the Project Manual). <br />G. Before submitting a shop drawing or any related material to Architect, Contractor shall: review <br />each such submission for conformance with the means, methods, techniques, sequences, <br />and operations of construction, and safety precautions and programs incidental thereto, all of <br />which are the sole responsibility of the Contractor; approve each such submission before <br />submitting it; and so stamp each such submission before submitting it. Architect shall <br />assume that no shop drawing or related submittal comprises a variation unless the Contractor <br />advises the Architect otherwise via a written instrument which is acknowledged by the <br />Architect in writing. <br />H. Architect will check submittals for conformance with design concepts of project. Approval by <br />Architect covers only such conformance. Effort will be made by Architect to discover any <br />errors, but responsibility for accuracy and correctness of all submittals shall be with the <br />Contractor. <br />Approval of submittals will be on a general basis only and shall not relieve the Contractor <br />from their responsibility for proper fitting and construction of the Work, nor from furnishing <br />materials and labor required by the Contract which may not be indicated on the submittals <br />when approved. <br />J. No portion of the work requiring submittals shall be commenced until the submittal for that <br />portion of the work has been approved by Architect. All such portions of work shall be in <br />accordance with the approved submittals. Any work performed without approved submittals <br />will be done so at the Contractor's own risk. Work found not to be in compliance with the <br />approved submittals shall be removed and corrected at the Contractor's own expense. <br />K. Number of Copies Required - Contractor shall submit following number of copies: <br />1. Subcontractor List: 1 -copy <br />2. Progress Schedule: 3 -copies, plus 1 -electronic copy in PDF <br />3. Schedule of Values: 3 -copies <br />4. Shop Drawings: 1 -electronic copy in PDF format. <br />5. Product Data/Material Lists: 1 -electronic copy in PDF format. <br />6. Samples: As specifically indicated in pertinent specification section. <br />7. Samples for Color/Pattern Selection: One set of manufacturer's complete range for <br />initial selection; and four (4) samples as requested of selected color/pattern for <br />inclusion in final color boards. As color selection is dependent on multiple submittals, it <br />is critical that all items requiring color decisions be submitted as early as possible and <br />at the same time. Selections will not be finalized until all color dependent/selection <br />submittals are received. <br />8. Substitution Request: 1 -copy <br />9. Request for Information: 1 -copy <br />10. Electronic Transfer: 1 -copy <br />11. Deferred Approvals: 3 -copies <br />12. Certifications: 3 -copies <br />13. Maintenance/Operations Manuals: 3 -hard copy, plus 1 -electronic copy in format <br />acceptable to the Owner. <br />14. Guarantees/Warranties: 1 -hard copy, plus 1 -electronic copy in format acceptable to the <br />Owner. <br />15. Record Drawings: 3 -hard copy, on green bond, plus 1 -electronic copy in format <br />acceptable to the Owner. <br />16. Irrigation As -Built Drawings: 3 -hard copies laminated. <br />10 <br />