Laserfiche WebLink
CONSTRUCTION FACILITIES AND <br />TEMPORARY CONTROLS <br />Section 01500 <br />15-1207 <br />water proof; weather -tight, and well lighted and ventilated; or equivalent trailer office; as <br />approved. Inspector office shall be fitted with T-0" counter along one side under a window, <br />shelves, desk, filing cabinet, chairs, and such other minor items of equipment needed. <br />Office and equipment shall remain property of Contractor and shall be removed by him upon <br />completion of work. <br />B. Telephone: Maintain telephone for joint use of Contractor, Architect and Inspectors for <br />duration of operations under this Contract. Provide answering machine and facsimile on-site <br />for use by Project Inspector, Architect and others. <br />1. Pay all charges for telephone service. <br />2. Make mutually agreeable arrangement with sub -contractors to provide them with <br />telephone accommodations for duration of construction and completion. <br />C. Provide electric outlets for lighting and power and make provisions for adequately heating <br />and cooling field office. <br />D. Provide the following minimum electronics within each office trailer. <br />1. Printer: Laser, 8 Y2" x 11" and 11" x 17" black and white. <br />2. Fax: Laser, plain paper with memory. <br />3. Copy Machine: Auto feed with collating capabilities, Laser, 8'/2" x 11" and 11" x 17" <br />black and white. Copier may be connected to function as printer and/or fax in lieu of <br />printer (item 1) and/or fax (item 2). <br />4. Network System: 801.11 g wireless router with 4 Ethernet ports. <br />5. Cables and Wiring: All necessary cables and wiring to connect the above <br />components. <br />6. Provide hardware and/or software support for items 1-5 above. Provide paper, service <br />and maintenance contract for Printer (item 1), Fax (item 2) and Copier (item 3) for the <br />life of the contract. <br />2.03 SANITARY FACILITIES <br />A. Toilet Facilities: Provide sufficient suitably enclosed chemical toilets with urinal for use by all <br />crafts engaged on project. Location shall be approved by Architect. <br />B. Washing Facilities: Provide properly mounted and adequate wash sinks connected to water <br />supply; in location as approved by Architect. <br />C. Drinking Water Facilities: Provide clean, sanitary and adequate drinking water. <br />2.04 CONSTRUCTION EQUIPMENT <br />A. General: Erect, equip, operate, and maintain all construction equipment in strict accordance <br />with applicable statutes, laws, ordinances, rules, and regulations of authorities having <br />jurisdiction; including insurance companies, with regard to safety, operation and fire hazard. <br />B. Provide and maintain scaffolding, staging, runways and similar equipment, as needed. <br />Coordinate use and furnishing with subcontractors. <br />C. Provide and maintain hoists and construction elevators, including elevators for hoisting <br />3 <br />