My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION FACILITIES AND <br />TEMPORARY CONTROLS <br />Section 01500 <br />15-1207 <br />in condition at least equal to that existing at start of Contract, except as may be <br />otherwise required by Contract Documents. <br />B. Temporary access roads are to be provided by and completely removed by the Contractor <br />upon completion of work. Place material such as base rock to provide and maintain safe <br />access to temporary facilities, temporary parking and all areas of work required for <br />continuing operations during winter months so that work may proceed in accordance with <br />project schedule. Contractor is to restore these areas to condition at least equal to that at <br />start of Contract or improve as required in the Contract Documents. All traffic is restricted <br />to these access roads and the designated construction boundary. <br />C. Site Storage and Work Areas: Owner will allocate available on-site storage and work areas <br />to Contractor, subject to change as may be necessary by job progress, such as site <br />development or other intervening work. If necessary, Contractor shall obtain off-site facilities <br />for storage at his expense. No storage will be allowed beyond the designated <br />construction boundary, or within designated Fire Lane. <br />D. Regulations: Observe and comply with rules and regulations in effect at occupied campuses <br />or other facilities, including, but not restricted to, parking and traffic regulations, security <br />restrictions, hours of access, and the like. <br />E. Use of public Sidewalks and Streets (if applicable): Make arrangements with public <br />authorities for temporary use of streets and sidewalks for offices, shops, storage, etc.. <br />Abide by rules, regulations, and ordinances, obtain permits, and pay fees therefor. <br />F. Debris Control: Keep work and storage areas clean and free of debris. Dispose of debris off <br />premises, as it accumulates. Pay all fees required for use of public dumps. Burning on <br />premises is prohibited. <br />G. Dust Controls: <br />1. Indoor Operations: Control dust resulting from indoor construction operations by <br />localizing it to greatest practicable extent using temporary partitions, curtains, or other <br />means which will prevent spread of dust beyond immediate work area. Duct openings <br />and other openings communicating with other parts of building shall have effective <br />temporary closures. <br />2. Outdoor Operations: Use water wagons or spray from hoses to control dust created <br />by outdoor work operations. Comply with all local and state dust control ordinances. <br />H. Dewatering Facilities: Provide and maintain dewatering and pumping facilities to keep site <br />reasonably dry, and to protect materials and installed work from water damage until <br />dewatering is no longer required. Dewatering shall also include dewatering of trenches and <br />footings due to surface run-off or sub -surface drainage facilities encountered, interrupted or <br />damaged. Contractor is responsible for providing proper drainage and conditions at utility <br />trenches, footing excavations or any other excavation as necessary for completing backfilling <br />and compaction operations. <br />I. Temporary Shoring: Provide all necessary shoring at trenches or other excavations as <br />required to stabilize the trench or excavation walls. Shoring shall be provided in strict <br />accordance with applicable statutes, laws, ordinances, rules, and regulations of authorities <br />having jurisdiction <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.