Laserfiche WebLink
ASBESTOS ABATEMENT -- <br />ROOFING <br />Section 02082 <br />15-1207 <br />outside the work area for Area Air Monitoring. <br />3.04 CLEAN-UP <br />A. Maintain a clean project site during and upon completion of work of this Section. Cleaning <br />shall be in accordance with the General Conditions. <br />3.05 LOCATIONS <br />A. A copy of the Asbestos Analysis Report is included with this section for review by the <br />contractor for identifying specific locations and extent of asbestos containing materials. This <br />report has been compiled by HB & T Environmental, Inc. for the school district. Any <br />questions, concerns or discrepancies should be brought to the attention of the Architect prior <br />to the bid. <br />END OF SECTION <br />iA1207 lincoln es - cafeteria replacementl4.06 projman102082 asbestos abatement roofrng.doc <br />