My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE CLEARING AND REMOVAL <br />Section 02110 <br />15-1207 <br />PART 1 - GENERAL <br />1.01 REQUIREMENTS <br />A. All applicable portions of Division 1- General Requirements are to be considered as included <br />with this section. <br />1.02 CODES <br />A. The following are minimum requirements and shall govern, except that all local, state and/or <br />federal codes and ordinances shall govern when their requirements are in excess hereof. <br />1.03 DESCRIPTION <br />A. Furnish all materials, labor, equipment, services, etc., necessary and incidental for the <br />completion of all site clearing and removal work as shown on the drawings and as specified <br />herein. <br />B. All onsite and offsite work included consists of but is not limited to the following: <br />1. Removal of existing sidewalks, drives, curbs, pavements, etc. per plans. Trees, shrubs, <br />irrigation. See Abatement Report. <br />2. Removal and capping off or relocation of existing underground utilities, underground <br />structures, etc. per plans. <br />3. Removal from site and disposal of all waste, debris and unusable material. <br />4. Backfill all open excavations created by the removal of underground utilities, <br />underground structures, etc. <br />1.04 RELATED SECTIONS <br />A. Related work specified elsewhere: <br />Section 02200 - EARTHWORK <br />1.05 QUALITY ASSURANCE <br />A. Obtain and pay for any permits, bonds, licenses, etc., required for Site Clearing and Removal <br />work. <br />B. All clearing and removal work shall be accomplished in strict accordance with all local and <br />state building codes, requirements and regulations including but not limited to noise <br />abatement, dust control, classification of disposal materials, etc. <br />C. Any work within street or highway right-of-way shall be done in accordance with the <br />requirements of the governmental agencies having jurisdiction and shall not begin until these <br />governing authorities have been notified. <br />
The URL can be used to link to this page
Your browser does not support the video tag.