Laserfiche WebLink
SITE CLEARING AND REMOVAL <br />Section 02110 <br />15-1207 <br />All trees, shrubs, and other items, indicated to remain shall be protected during the <br />entire progress of the work. This includes protection of the root system. The trees shall <br />be fenced if they are located in or near an area being used for material storage or <br />subject to damage by traffic during construction. Low hanging branches and unsound <br />or unsightly branches on trees or shrubs designated to remain shall be removed. All <br />trimmings shall be done by skilled workmen and in accordance with good tree surgery <br />practices. <br />B. Any damage done by this contractor to existing structures, pipe lines, utilities, landscaping, <br />etc. indicated to remain shall be repaired by him and at his expense in a manner acceptable <br />to the Owner of the damaged property. This contractor shall report any existing damage prior <br />to the beginning of this work. <br />C. All temporary shoring, bracing, etc., and maintenance there to required for the completion of <br />clearing and removal work shall be provided by the Contractor whose work requires <br />protection. <br />This contractor shall work in concert per local and state codes to insure the provisions <br />of adequate bracing, shoring, temporary cross over for pedestrian and vehicular traffic <br />including guard rails, lamps, warning signs and flags as required by agencies having <br />jurisdiction as directed by the Owner. Remove same when necessity for protection <br />ceases. <br />1.09 DRAINAGE MAINTENANCE <br />A. During the entire course of clearing and removal operations, all existing drainage ways, both <br />into and from the project area shall be rerouted as required and/or maintained in a functional <br />condition. <br />B. At all times during the clearing and removal operation, the exposed areas of subgrade shall <br />be maintained in a condition compatible with positive drainage of the work area. Failure to <br />maintain such drainage shall be considered adequate cause for the District Representative to <br />order temporary suspension of the work. <br />C. If it should become necessary to stop work for indefinite periods, take every precaution to <br />prevent damage or deterioration of the work already performed. Provide suitable and <br />functional drainage by installing ditches, filter drains, temporary cut-off lines, etc., and erect <br />temporary protective structures where necessary. All embankments shall be back -bladed <br />and suitably sealed to protect against adverse weather conditions. <br />PART 2 - PRODUCT <br />2.01 MATERIALS <br />A. All materials used to backfill excavations, trenches, holes, pits, etc. caused by utility, <br />underground structure or underground storage tank removal shall meet the requirements for <br />fill material and compaction indicated in Section 02200 and 02210. <br />3 <br />