My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRENCHING AND BACKFILLING <br />Section 02210 <br />15-1207 <br />B. Bedding: Type of material and degree of compaction for bedding backfill shall be as <br />defined in the Details and Specifications. <br />C. Pipe Zone and Upper Zone Backfill: <br />1. Type of material and degree of compaction Pipe Zone and Upper Zone Backfill <br />shall be as required by Drawings, Details, & Specifications. <br />2. Upper Zone Backfill shall not be placed until conformance of Bedding and Pipe <br />Zone Backfill with specified compaction test requirements has been confirmed. <br />3. Backfill shall be brought up at substantially the same rate on both sides of the <br />pipe and care shall be taken so that the pipe is not floated or displaced. Material <br />shall not be dropped directly on pipe. <br />D. Backfill Compaction: <br />1. Backfill shall be placed in layers which, when compacted shall not exceed 6 <br />inches in thickness. Each layer shall be spread evenly and thoroughly mixed to <br />insure uniformity. Do not backfill over, wet, frozen or soft subgrade surfaces. <br />Employ a placement method that does not disturb or damage foundation walls, <br />perimeter drainage, foundation damp -proofing, waterproofing or protective cover. <br />2. When moisture content of fill material is below that required to achieve specified <br />density, add water until proper moisture content is achieved. When moisture <br />content is above that required, aerate by blading or other methods until specified <br />moisture content is met, see section 02200, 3.08, B. <br />3. After each layer has been placed, mixed and spread evenly, it shall be <br />thoroughly compacted to 90% of maximum dry density while at specified <br />moisture content. Compact each layer over its entire area until desired density <br />has been obtained. <br />4. Compaction: All backfill operations shall be observed by the Inspector of Record <br />and/or Geotechnical Engineer. Field density tests shall be made to check <br />compaction of fill material. If densities are not satisfactory, Contractor will be <br />required to change equipment or procedure or both, as required to obtain <br />specified densities. Notify Inspector and Architect at least 24 hours in advance <br />of any operation. <br />E. Backfill in Areas Previously Lime or Cement Treated <br />Where trenching occurs in areas that have been lime or cement treated, class 2 <br />aggregate bases or approved controlled density backfill material shall be used <br />for the top 12 -inches minimum of the trench or thickness shall match the depth of <br />treated material. <br />3.06 TRENCH AND SITE RESTORATION <br />A. Finished surface of trenches shall be restored to a condition equal to, or better than the <br />condition as existed prior to excavation work. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.