My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PIPED UTILITIES <br />Section 02700 <br />15-1207 <br />2. Provide ball valve at all test ports with brass plug in valve. <br />2.11 TAPPING SLEEVE <br />A. Shall be used on pipe sizes 6" thru 12" and shall be made with stainless steel material <br />including stainless steel bolts. Flanges shall be ductile iron or high carbon steel. <br />Gaskets shall seal full circumference of pipe. Shall be manufactured for operating <br />pressure of 200 psi, and shall pass test pressure of 300 psi. Romac SST series; <br />Smithblair 662; Mueller H304; Ford "FAST" tapping sleeve. <br />2.12 SERVICE SADDLES <br />A. Shall be used on pipe size 2" thru 4". Body shall be made from ductile iron with epoxy <br />coating or bronze. Cascade Style CSC -1; A.Y. McDonald model 3891 AWWA/3892 <br />FNPT; Smith -Blair #317; Ford S70, S71, S90, (style B). All service saddles in the right <br />of way shall be per the local jurisdiction. <br />2.13 TRACER WIRE <br />A. No. 10 THW solid copper wire. Use waterproof wire connectors all joints. <br />PART 3 - EXECUTION <br />3.01 DRAWINGS AND COORDINATION <br />A. General arrangement and location of piping, etc., are shown on Drawings or herein <br />specified. Install work in accord therewith, except for minor changes that may be <br />necessary on account of other work or existing conditions. Before excavation, carefully <br />examine other work that may conflict with this work. Install this work in harmony with <br />other craft and at proper time to avoid delay of work. <br />B. Verify invert elevations at points of connection to existing systems prior to any <br />excavation. If invert elevations differ from that shown on drawings, notify Architect <br />immediately. <br />C. In advance of construction, work out minor changes if conflicts occur with electrical or <br />mechanical. Relocate services to suit actual conditions and work of other trades to avoid <br />conflict therewith. Any adjustments or additional fittings to make adjustments shall not <br />be cause for additional costs to the owner. <br />D. Execute any work or apparatus shown on drawings and not mentioned in specifications, <br />or vice versa. Omission from Drawings or Specifications of any minor details of <br />construction, installation, materials, or essential specialties does not relieve Contractor <br />of furnishing same in place complete. <br />E. Graded pipes shall take precedence. If conflict should occur while placing the domestic <br />water and fire service piping, the contractor shall provide any and all fittings necessary <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.