My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PIPED UTILITIES <br />Section 02700 <br />15-1207 <br />operation. <br />2. Bell and Spigot Joints: Lubricate inside of bells and outside of spigots with soap <br />solution. Wedge joints tight. Bell of bell and spigot pipe to be pointed upgrade. <br />C. Backfilling: <br />1. General: Do not start backfill operations until required testing has been <br />accomplished. <br />2. Compaction and Grading: Remainder of backfill shall be in accordance with <br />Section 02210 — TRENCHING AND BACKFILLING. <br />3. If trenching in area previously lime or cement treated backfill top of trench <br />section, same depth as lime or cement treatment with Class 2 Aggregate Base <br />compacted to 95% minimum relative compaction. <br />3.04 INSTALLATION OF WATER PIPING <br />A. Immediately cap or plug ends of, and opening in, pipe and fittings to exclude dirt until <br />final connections made. Use reducing fittings where any change in pipe size occurs. <br />Bushings shall not be used. <br />B. General: Should existing conditions or other work prevent the running of pipes or the <br />setting of equipment at the points indicated by drawings, changes as authorized by the <br />Architect shall be made without additional cost to the Owner. <br />E. All bolts used on mechanical fittings shall be thoroughly coated with an asphaltic <br />bituminous coating conforming to latest edition NFPA 24. <br />F. All buried metal shall be incased with 8 mil polyethylene wrap so that no soil is in contact <br />with metal. <br />G. Do not install water lines in same trench with non-metallic sewer lines unless bottom of <br />water pipe at all points is at least 12" above top of sewer line and water line is placed on <br />solid shelf excavated at one side of common trench with a minimum of 12 inch <br />horizontal separation. <br />3.05 CLOSING IN OF UNINSPECTED WORK <br />A. Do not allow or cause work installed to be covered up or enclosed before it has been <br />inspected, tested, and approved. Should work be enclosed or covered up before it has <br />been approved, uncover work at own expense. After it has been inspected, tested and <br />approved, make repairs necessary to restore work of other contractors to condition in <br />which it was found at time of cutting. <br />3.06 CARE AND CLEANING <br />A. Repair or replace broken, damaged, or otherwise defective parts, materials, and work. <br />Leave entire work in new condition satisfactory to Architect. At completion, carefully <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.