Laserfiche WebLink
LANDSCAPING <br />Section 02900 <br />Project 15-1207 <br />D. In case of failure to obtain any verification by the Project Inspector as required above, <br />remove and replace work as necessary to obtain the verification at no additional cost to <br />the Owner. <br />E. Beginning of Maintenance Period: Verify all work is complete, then request and hold a <br />meeting to include the Landscape Architect, Proiect Inspector, Architect and Owner's <br />Representative for authorization to begin the landscape maintenance period. <br />F. End of Maintenance: Verify that all work is complete and acceptable, and that the <br />maintenance has been completed per specifications; and continue to provide landscape <br />maintenance until the Owner's Representative has accepted the work. <br />1.06 SUBMITTALS AND SUBSTITUTIONS <br />A. See Section 01300 — SUBMITTALS for additional requirements. <br />B. Plant Material: Within fifteen (15) days after award of contract, locate plant materials <br />required for construction. Ensure that trees and shrubs are contract- grown from a <br />certified nursery. Notify Owner's Representative of plant material "tied off' for review at <br />selected nursery. If specified material is not obtainable, submit the following to Owner's <br />Representative: proof of non-availability, proposal for use of equivalent material, <br />photographs of alternative choices of plant material. Include clear, written description <br />of type, size, condition, and general character of plant material. <br />C. Data Sheets: Provide product data for each type of landscape material indicated in the <br />Drawings and Specifications. <br />D. Samples: Submit samples of the following materials to Landscape Architect for approval: <br />Soil amendment: (3) one -quart zip -locked plastic bags. <br />2. Bark Mulch: (3) one -quart zip -locked plastic bags. <br />3. Imported Topsoil: (3) one -quart zip -locked plastic bags. <br />E. Provide soils analysis reports prepared by a qualified soils laboratory in compliance with <br />the Soil Testing Requirements under "Soil Testing" in Part 3.02 of this Section. <br />F. Prior to planting, submit copies of all trucking or packaging tags for all soil amendment, <br />fertilizer and other additives to Landscape Architect so the quantities can be verified. <br />1.07 PROTECTION AND CLEAN-UP <br />A. Provide protection for persons and property throughout progress of work. Use <br />temporary barricades as required. Proceed with work in such manner as to minimize <br />spread of dust and flying particles and to provide safe working conditions for personnel. <br />Store materials and equipment where directed. <br />B. Existing Construction: Execute work in an orderly and careful manner to protect paving, <br />work of other trades, and other improvements. <br />5 <br />