My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONCRETE REINFORCEMENT <br />Section 03200 <br />15-1207 <br />a. Lap splices in concrete: Lap splice lengths not less than 75 bar diameters, 36" <br />minimum for #6 bars and smaller. 93 bar diameters for #7 bars and larger. <br />b. Lap splices in CMU: Lap splice lengths not less than 75 bar diameters; 40" <br />minimum, unless otherwise shown. Bars of size #8 and larger shall be spliced by <br />welding or by approved mechanical connectors. Mechanical connectors shall <br />develop 125% of the specified yield strength of the bar in tension. <br />C. Welded splices: Butt and complete penetration weld per AWS D1.4 to develop, in <br />tension, not less than 125% of bar yield strength. <br />3.03 CLEANING <br />A. At time of placing concrete, clean reinforcement and any other embedded items thoroughly <br />of loose rust, mill scale, oil, grease, and other foreign material that reduces or destroys bond. <br />3.04 WELDING <br />A. Welding of reinforcing bar shall be performed only where indicated on plans and in <br />compliance with AWS D1.4. All welding of reinforcement is to be inspected in accordance <br />with CBC Table 1704A.4 Item 2. <br />3.05 INSPECTION <br />A. Approval of reinforcing steel, after installation, must be received from Inspector. Architect, <br />Structural Engineer and DSA must be notified 48 hrs. in advance of beginning of concrete <br />placement operations. Inspection of welding will be done by laboratory and all costs in <br />connection with this inspection will be paid as provided for in General Conditions, except that <br />cost of all welding inspection required beyond 3 days total of shop and field welding will be <br />backcharged to Contractor. <br />END OF SECTION <br />i:11207lincoln es - cafeteria replacementl4.06 projmanlconsultantsVincoln es struct specs 15-0623\03200_concrete reinforcement <br />w asg edits 15-0623.docx <br />Last Updated: July 31, 2013 <br />El <br />
The URL can be used to link to this page
Your browser does not support the video tag.