My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
METAL DECK <br />Section 05300 <br />15-1207 <br />F. Separate sheets and store decking on dry wood sleepers; slope for positive drainage. <br />1.08 QUALIFICATIONS <br />A. Qualification of Field Welding: Use qualified welding processes and welding operators in <br />accordance with "Welder Qualification" procedures of AWS. <br />1. Fabricator and Erector shall provide Architect and Testing Laboratory with names of <br />welders to be employed on Work, together with certification that each of these welders <br />has passed qualification tests within last year using procedures covered in American <br />Welding Society Standard D.1.3. <br />2. If recertification of welders is required, retesting will be Contractor's responsibility. <br />3. Welding shall be performed by qualified light gage (sheet steel) welders. Any welder <br />producing unsatisfactory welding, even though he has passed qualification tests, shall <br />be immediately recertified or replaced with qualified welder. <br />1.09 PROJECT CONDITIONS <br />A. Design deck to section modulus as specified on contract drawings and a maximum vertical <br />deck deflection of 0240. <br />1.10 FIELD MEASUREMENTS <br />A. Make and be responsible for all field dimensions necessary for proper fitting and completion <br />of work. Report discrepancies to Contractor before proceeding. The Contractor shall be <br />responsible for all errors of detailing and fabrication and for the correct fitting of all metal <br />decking to each other and to their supports. Provide holes and reinforcement for mechanical <br />and electrical penetrations. <br />1.11 TESTING AND INSPECTION <br />A. All steel decking layout and field welding of decking to supports and to decking will be <br />inspected and certified by the Owner's Testing Laboratory. <br />B. Material certification per CBC, Section 2231A.1. <br />C. Welding inspection per CBC, Section 2231A.3. <br />1.12 PROJECT RECORD DOCUMENTS <br />A. Provide per Section 01700, Contract Closeout. <br />PART 2 - PRODUCTS <br />2.01 MANUFACTURERS <br />A. General: Deck shall be of type and manufacturer as specified on the drawings or approved <br />equal. All equals must meet or exceed ICC approved design values of specified decking. <br />Deck designations used on Drawings refer to ASC Steel Deck designations; other decks <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.