My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
METAL DECK <br />Section 05300 <br />15-1207 <br />3.04 ADJUSTING AND CLEANING <br />A. Touch -Up Painting: After decking installation, wire brush, clean, and paint scarred areas, <br />welds and rust spots on top and bottom surfaces of decking units and supporting steel <br />members. <br />Touch-up galvanized surfaces with galvanizing repair paint applied in accordance with <br />manufacturer's instructions. <br />B. After erection, all surfaces shall be cleaned and left free of all grime and dirt. Decking shall <br />be cleaned with solvents, if necessary to provide a surface, which will readily bond with <br />concrete fill and direct -to -steel fireproofing. Remove unused materials, tools, scaffolding and <br />debris for the premises and leave the area broom clean. <br />3.05 PROTECTION <br />A. Protect work and materials of this Section prior to and during installation, and protect the <br />installed work and materials of other trades. <br />B. In the event of damage, make all repairs and replacements necessary to the approval of the <br />Architect at no additional cost to the Owner. <br />C. Exposed finishes shall be free from scratches, dents, permanent discolorations and other <br />defects in workmanship or material. <br />3.06 FIELD QUALITY CONTROL <br />A. Owner will employ testing laboratory (as per Section 01400 -Testing Laboratory Services) to <br />perform tests and to submit test reports on items stated below: <br />Testing laboratory will perform field inspection of metal deck for proper type, gage, <br />finish, welding quality and erection, including diaphragm connections for size, location <br />and spacing. <br />3.07 DEFECTIVE WORK <br />A. All work not in conformance with these specifications and/or generally accepted standards of <br />the trade, will be deemed defective by the Architect and will be rejected. All work that is <br />defective shall be corrected or replaced as directed by the Architect. Corrections redesign, <br />and replacement of defective work shall be at Contractor's expense. <br />END OF SECTION <br />E:? <br />
The URL can be used to link to this page
Your browser does not support the video tag.