Laserfiche WebLink
ROUGH CARPENTRY <br />Section 06100 <br />15-1207 <br />PART 1 - GENERAL <br />1.01 INCLUSION OF OTHER CONTRACT DOCUMENTS <br />A. The General Conditions, Supplementary Conditions and Division 1 are fully applicable to this <br />Section, as if repeated herein. <br />1.02 RELATED WORK SPECIFIED ELSEWHERE <br />A. Section 03100, Concrete Formwork. <br />B. Section 05100, Structural Steel. <br />C. Section 05110, Miscellaneous Metals. <br />D. Section 06190, Prefabricated Wood "I" Joists. <br />E. Section 06200, Finish Carpentry & Millwork. <br />1.03 QUALITY ASSURANCE <br />A. Use only new materials and products, unless existing materials or products are specifically <br />shown otherwise on the Drawings to be salvaged and re -used. <br />B. All materials, components, assemblies, workmanship and installation are to be observed by <br />the Owner's Inspector of Record. Work not so inspected is subject to uncovering and <br />replacement. <br />C. Special Inspection of the fabrication of engineered wood products is required per CBC <br />1704A.2 unless fabricator is registered and approved by the California Division of State <br />Architect <br />1.04 SUBMITTALS <br />A. Refer to Section 01300. <br />B. Manufacturer's Data: Submit list and complete descriptive data of all products proposed for <br />use. Include manufacturer's specifications, published warranty or guarantee, installation <br />instructions, and maintenance instructions. <br />C. Provide mill certificates for D.F. pressure treated materials. <br />D. Machine Nailing: Submit technical data for gain and nails to be used, along with sample nails. <br />1.05 GUARANTEE <br />A. Refer to General Conditions and Section 01300. <br />1 <br />