Laserfiche WebLink
ROUGH CARPENTRY <br />Section 06100 <br />15-1207 <br />1.06 REFERENCES AND STANDARDS <br />A. California Building Code (CBC), current edition, as adopted by the California Division of the <br />State Architect (DSA). <br />B. California Green Building Standards Code, current edition, as adopted by the California <br />Division of the State Architect (DSA). <br />C. ANSI/AF & PA National Design Specification for Wood Construction. <br />D. ANSI/AF & PA Special Design Provisions for Wind and Seismic. <br />E. PS 1 - Construction and Industrial Plywood; National Institute of Standards and Technology <br />(Department of Commerce). <br />F. PS 2 — Performance Standard for wood -based structural -use panels (Department of <br />Commerce) <br />G. PS 20 - American Softwood Lumber Standard; National Institute of Standards and <br />Technology (Department of Commerce). <br />H. RIS (GR) - Standard Specifications for Grades of California Redwood Lumber; Redwood <br />Inspection Service. <br />WCLIB (GR) - Standard Grading Rules for West Coast Lumber No. 17, September 1991, rev. <br />January 2004; West Coast Lumber Inspection Bureau. <br />WWPA G-5 - Western Lumber Grading Rules, October 2004; Western Wood Products <br />Association. <br />1.07 DELIVERY, STORAGE AND HANDLING <br />A. Deliver undamaged products to job in manufacturer's sealed containers and/or original <br />bundles with tags and labels intact. <br />B. Store materials in protected, dry conditions off of ground and in areas so as to not interfere <br />with the progress of the work. <br />C. Transport, store and handle in strict accord with the manufacturer's written <br />recommendations. <br />D. Make delivery to job when notified by Contractor verifying that the job is ready to receive the <br />work of this Section and that arrangements have been made to properly store, handle and <br />protect such materials and work. <br />1.08 FIELD MEASUREMENTS <br />A. Make and be responsible for all field dimensions necessary for proper fitting and completion <br />of work. Report discrepancies to Architect before proceeding. <br />2 <br />