Laserfiche WebLink
PREFABRICATED WOOD <br />"I" JOISTS <br />Section 06190 <br />15-1207 <br />3. Manufacturer's installation instructions including instructions on lateral bracing. <br />4. Details of member connections. <br />5. Structural calculations signed by a California Registered Civil Engineer. <br />D. Product Data: Contractor shall provide complete, accurate equivalence data when <br />submitting alternate products to those specified. Provide samples of these items upon <br />request. <br />E. Manufacturer's Certificate: Upon completion of fabrication of engineered wood products, the <br />approved fabricators not subject to Special Inspection shall submit a Certificate of <br />Compliance to the owner and DSA stating that the work was completed in accordance with <br />the approved Construction Document. <br />1.05 GUARANTEE <br />A. Refer to General Conditions and Section 01300. <br />B. Submit fully executed Guarantee with submittal package required by Article 1.04. <br />1.06 REFERENCES AND STANDARDS <br />A. California Building Code (CBC), current edition, as adopted by the Division of State Architect <br />(DSA). <br />B. California Green Building Standards Code, current edition, as adopted by the California <br />Division of the State Architect (DSA). <br />C. Division of the State Architect (DSA) Interpretation of Regulation No. IR A-5. <br />D. Division of the State Architect (DSA) Interpretation of Regulation No. IR 23-9.10. <br />E. International Code Council (ICC) ICC AC14 —Accepted Criteria for Prefabricated Wood (- <br />Joists <br />1.07 DELIVERY, STORAGE AND HANDLING <br />A. Deliver undamaged products to job in manufacturer's sealed containers and/or original <br />bundles with tags and labels intact. <br />B. Store materials in protected, dry conditions off of ground and in areas so as to not interfere <br />with the progress of the work. <br />C. Transport, store and handle in strict accord with the manufacturer's written <br />recommendations. <br />D. Make delivery to job when notified by Contractor verifying that the job is ready to receive the <br />work of this Section and that arrangements have been made to properly store, handle and <br />protect such materials and work. <br />2 <br />