Laserfiche WebLink
SHEET METAL <br />Section 07600 <br />15-1207 <br />D. Submit executed Guarantee of Contractor/Subcontractor per Article 1.05. <br />1.05 GUARANTEE <br />A. Refer to General Conditions and Section 01300. <br />B. Submit fully executed Guarantee with submittal package required by Article 1.04. <br />C. Guarantee shall cover damage from leaks due to defective materials or workmanship. <br />1.06 REFERENCES AND STANDARDS <br />A. California Building Code (CBC), current edition, as adopted by the California Division of the <br />State Architect (DSA). <br />B. California Green Building Standards Code, current edition, as adopted by the California <br />Division of the State Architect (DSA). <br />C. Except as herein modified, fabricate and install Work in accordance with printed standards of <br />Sheet Metal and Air Conditioning Contractors National Association (SMACNA) Architectural <br />Sheet Metal Manual and Specifications, latest edition. <br />D. ANSI / SPRI ES -1 Wind Design Standard for Edge Metal Systems. <br />1.07 DELIVERY, STORAGE AND HANDLING <br />A. Deliver undamaged products to job in manufacturer's sealed containers and/or original <br />bundles with tags and labels intact. <br />B. Store materials in protected, dry conditions off of ground and in areas so as to not interfere <br />with the progress of the work. <br />C. Transport, store and handle in strict accord with the manufacturer's written recommendations. <br />D. Make delivery to job when notified by Contractor verifying that the job is ready to receive the <br />work of this Section and that arrangements have been made to properly store, handle and <br />protect such materials and work. <br />1.08 FIELD MEASUREMENTS <br />A. Make and be responsible for all field dimensions necessary for proper fitting and completion <br />of work. Report discrepancies to Architect before proceeding. <br />1.09 PROJECT RECORD DOCUMENTS <br />A. Provide per Section 01700, Contract Closeout. <br />PART 2 - PRODUCTS <br />K <br />