My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENTRANCES & STOREFRONTS <br />Section 08410 <br />15-1207 <br />2.05 FINISHES <br />A. Factory Finishing: <br />1. Kawneer Permanodic@) AA-M12C22A44, AAMA 611, Architectural Class I Color Anodic <br />Coating (Color to be selected by Architect). <br />2. Kawneer Permanodic® AA-M12C22A41, AAMA 611, Architectural Class I Clear Anodic <br />Coating (Color #14 Clear) (Optional). <br />2.06 ENTRANCE HARDWARE <br />A. See 08710, Finish Hardware <br />2.07 ACCESSORIES <br />A. Fasteners: Where exposed, shall be Stainless Steel. <br />B. Gaskets: Glazing gaskets shall be extruded EPDM rubber. <br />C. Perimeter Anchors: Aluminum. When steel anchors are used, provide insulation between <br />steel material and aluminum material to prevent galvanic action. <br />PART 3 - EXECUTION <br />3.01 INSPECTION <br />A. Prior to installation of this work, carefully inspect and verify that the installed work of all other <br />trades is complete to the point where this installation may properly commence. <br />B. Verify that specified items may be installed in accordance with the approved design. <br />C. In the event of discrepancy, immediately notify Architect. Do not proceed in discrepant areas <br />until discrepancies have been fully resolved. <br />3.02 COORDINATION <br />A. To facilitate installation, it shall be the responsibility of the window supplier to properly <br />prepare the vents to accept the operators and to insure the vents are properly hung for finger- <br />tip operation providing free movement to the control systems. Vent preparation details shall <br />be shown on the Control Systems Shop Drawings and installation instructions for the erector <br />shall be provided at the time of delivery. <br />B. Prior to fabrication verify that all hardware may be properly installed. <br />3.03 INSTALLATION <br />A. General: Install framing system in accordance with manufacturer's instructions and AAMA <br />storefront and entrance guide specifications manual. <br />Dissimilar Materials: Provide separation of aluminum materials from sources of corrosion <br />or electrolytic action contact points. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.