My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SKYLIGHTS & LIGHT <br />CONTROL LOUVERS <br />Section 08621 <br />15-1207 <br />D. Make delivery to job when notified by Contractor verifying that the job is ready to receive the <br />work of this Section and that arrangements have been made to properly store, handle and <br />protect such materials and work. <br />1.08 PROJECT CONDITIONS <br />A. Products shall be available at project when required for installation so as not to delay job <br />progress. Cooperate with installers performing work under other Sections involved to effect <br />proper installation. <br />B. Installation of plastic skylights in fire retardant roofs shall not be started until the units <br />proposed have been approved by the Division of the State Architect, Fire & Life Safety. <br />Review shall be based on test data from an acceptable laboratory, or evidence of listing with <br />the DSA. <br />C. Maintain environmental conditions (temperature, humidity, and ventilation) within limits <br />recommended by manufacturer for optimum results. Do not install products under <br />environmental conditions outside manufacturer's absolute limits. <br />1.09 PERFORMANCE REQUIREMENTS <br />A. System to provide for expansion and contraction within system components caused by a <br />cycling temperature range of 170 F degrees without causing detrimental effects to system or <br />components. <br />B. Design and size members to withstand dead loads and live loads caused by snow, hail, and <br />pressure or suction of wind acting vertically as calculated in accordance with state code to a <br />design pressure of 40 Ib/sq ft. <br />C. Aluminum Skylight structures shall be designed for loads prescribed by the governing building <br />code. Deflection of rafters will not exceed L/175 of the rafter span. <br />D. Skylights utilizing plastic in their assemblies shall meet the requirements of Section 2603.7, <br />CBC. Provide test data demonstrating compliance. <br />1.10 FIELD MEASUREMENTS <br />A. Make and be responsible for all field dimensions necessary for proper fitting and completion of <br />work. Report discrepancies to Architect before proceeding. <br />PART 2 - PRODUCTS <br />2.01 SKYLIGHTS <br />A. General: All skylights shall be factory fabricated aluminum framed units, in locations as shown <br />and as detailed on the drawings. <br />B. Sizes: As indicated on the Drawings. <br />C. Acceptable Products: <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.