My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIBERGLASS REINFORCED PANELS <br />Section 09772 <br />15-1207 <br />B. Submit fully executed Guarantee with submittal package required by Article 1.04. <br />1.06 REFERENCES AND STANDARDS <br />A. California Building Code (CBC), current edition, as adopted by the California Division of the <br />State Architect (DSA). <br />B. California Green Building Standards Code, current edition, as adopted by the California <br />Division of the State Architect (DSA). <br />1.07 DELIVERY, STORAGE AND HANDLING <br />A. Deliver undamaged products to job in manufacturer's sealed containers and/or original <br />bundles with tags and labels intact. <br />B. Store materials in protected, dry conditions off of ground and in areas so as to not interfere <br />with the progress of the work. <br />C. Transport, store and handle in strict accord with the manufacturer's written recommendations. <br />D. Make delivery to job when notified by Contractor verifying that the job is ready to receive the <br />work of this Section and that arrangements have been made to properly store, handle and <br />protect such materials and work. <br />1.08 PROJECT CONDITIONS <br />A. Products shall be available at project when required for installation so as not to delay job <br />progress. Installer for these products shall cooperate with installers performing work under <br />other Sections involved to effect proper installation. <br />1.09 FIELD MEASUREMENTS <br />A. Make and be responsible for all field dimensions necessary for proper fitting and completion <br />of work. Report discrepancies to Architect before proceeding. <br />PART 2 - PRODUCTS <br />2.01 MATERIALS <br />A. Panels: Nudo Products, Inc., Fiber -Lite® Liner Panels, fiberglass reinforced panel (FRP). <br />1. LP -F9 (textured) <br />2. Color: As selected by the Architect from a minimum of 8 standard colors. <br />3. Fire rating to be Class III with a flame spread rating of less than 200 and a smoke <br />developed rating not to exceed 450. <br />B. Moldings: Provide manufacturer's moulding for all panel edges and other locations to suit <br />conditions. Trim to be vinyl molding to match panel color [OR] clear anodized aluminum <br />molding <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.