Laserfiche WebLink
COMPOSITE TOILET PARTITIONS <br />Section 10170 <br />15-1207 <br />1.07 REFERENCES AND STANDARDS <br />A. Title 24, Part 2, CCR, California Building Code. <br />B. National Fire Protection Association 101 Life Safety Code 2000 Edition, Chapters 5, 6, 8-30. <br />C. ANSI A117.1-1998 Specifications for Making Buildings and Facilities Accessible to and <br />Usable by Physically Handicapped People. <br />D. ADA, Accessibility Guidelines for Buildings and Facilities, Federal Register Volume 56, <br />Number 144, Rules and Regulations. <br />E. US Green Building Council (USGBC) Leadership in Energy and Environmental Design <br />(LEED) Program, Current Version. <br />F. American Society for Testing and Materials Standards: <br />1. ASTM E84-01 Standard Test Method for Surface Burning Characteristics of Building <br />Material. <br />2. ASTM D2794 -93(1999)e1 Standard Test Method for Resistance of Organic Coatings to <br />the Effects of Rapid Deformation (Impact). <br />3. ASTM D2197-98(2002) Standard Test Method for Adhesion of Organic Coatings by <br />Scrape Adhesion. <br />4. ASTM D6578-00 Standard Practice for Determination of Graffiti Resistance. <br />1.08 DELIVERY, STORAGE AND HANDLING <br />A. Deliver undamaged products to job in manufacturer's sealed containers and/or original <br />bundles with tags and labels intact. <br />B. Store materials in protected, dry conditions off of ground and in areas so as to not interfere <br />with the progress of the work. <br />C. Transport, store and handle in strict accord with the manufacturer's written recommendations <br />to avoid deformation. <br />D. Make delivery to job when notified by Contractor verifying that the job is ready to receive the <br />work of this Section and that arrangements have been made to properly store, handle and <br />protect such materials and work. <br />1.09 FIELD MEASUREMENTS <br />A. Make and be responsible for all field dimensions necessary for proper fitting and completion <br />of work. Report discrepancies to Architect before proceeding. <br />1.10 COORDINATION <br />A. Coordinate placement of blocking in walls. <br />3 <br />