FOOD SERVICE <br />EQUIPMENT <br />Section 11400 <br />15-1207 <br />4. Installation of any qualified substituted equipment is the Food Service Equipment <br />Contractor's responsibility. Including any mechanical, electrical, structural changes <br />required for the installation of qualified substitution shall be without additional cost to the <br />Owner. <br />E. DEFERRED APPROVAL ITEMS: <br />1. For the items identified on the Equipment List as (Deferred Approval Item), the following <br />submittal requirements shall be provided: <br />A. Product data. <br />B. Manufacturer's recommended methods of installation coordinated with actual field <br />conditions for anchorage to actual substrate conditions. <br />C. Shop Drawings: Indicate types, sections, gages, materials, completely dimensioned <br />layouts and configurations, hardware, fasteners, operators and shop finishes and other <br />required coatings. Provide calculations for all required connections. <br />D. Structural calculations, detail drawings, and all additional necessary drawings and <br />specifications for a deferred approval shall be signed by a Structural Engineer licensed <br />in the State of California. <br />E. Provide a copy of the installer's certification and a copy of the manufacturer's written <br />certification criteria. Provide list of a minimum of (5) five jobs installed by Installation <br />Company with contact phone numbers of both the project's General Contractor and <br />Owner. <br />1.5 DISCREPANCIES: <br />A. In the event of discrepancies within the Contract Documents, the Architect and/or Consultant <br />shall be so notified in sufficient time prior to bid opening, ten (10) days to allow issuance of an <br />addendum. <br />B. In the event that time does not permit notification or clarification of discrepancies prior to the bid <br />opening, following shall apply: The drawings and drawing schedules shall govern in matters of <br />quantity; the specifications in matter of quality. In the event of conflict within drawings involving <br />quantities, or within the specifications involving quality, the greater quantity and high quality <br />shall apply. Such discrepancies shall be noted and clarified in the contractors bid. No <br />additional allowances will be made because of errors, ambiguities or omissions which <br />reasonable should have been discovered during the preparation of the bid. <br />1.6 RESPONSIBILITY: <br />A. The work as specified in this division shall include assuring that all required submittals conform <br />to the intent and meaning of the documents, conditions at the job site, and all local codes and <br />ordinances. <br />B. Visit the job site to field check actual wall dimensions and utility rough -ins. Be responsible for <br />furnishing, fabricating, and installing the equipment in accordance with the available space and <br />utility services as they exist on the job site. <br />ld <br />