Laserfiche WebLink
FOOD SERVICE <br />EQUIPMENT <br />Section 11400 <br />15-1207 <br />C. Welded parts shall be non -porous and free of imperfections. Welds on galvanized metal shall <br />be ground smooth, sandblasted and sprayed with molten zinc or 1200 degrees F to a thickness <br />of .004". Tinning of welds will not be acceptable. Welds of stainless steel shall be ground and <br />polished to the original finish and all grained in the same direction. <br />D. All fixtures, unless made of stainless steel, shall be finished in sprayed lacquer in color as <br />chosen by the architect; or if specifically stated, in "plastic laminate"; in pattern and/or color as <br />selected by the Architect. <br />3.3 POST INSTALLATION PROCEDURES <br />A. Prior to being offered for final acceptance, all equipment shall be thoroughly cleaned. This shall <br />include removal of all stains, paint spots, protective wrapping and coatings, tapes, grease, oil, <br />plaster, dust, polishing compounds, etc. and cleaning of floors in food service areas (broom <br />clean) and signed off by the General Contractor with a copy to the Architect and/or Consultant. <br />B. After installation at least ten (10) days prior to offering for acceptance, all equipment shall <br />undergo a "Start-up" procedure by a Factory Authorized service dealer. Equipment is to be <br />inspected, tested, calibrated and adjusted for normal operation conditions. If inspection or <br />testing indicated defects, such defects shall be corrected and the inspection and test repeated <br />to insure a perfect operation of all equipment, prior to final acceptance and for a period ninety <br />days after final acceptance. <br />C. Upon completion of the project, the Contractor shall furnish the Owner two (2) sets of <br />dimensional prints, data sheets, spare parts lists and operating manuals for each piece of <br />mechanical equipment; each set shall be neatly bound in a loose leaf binder, each set shall be <br />complete with and index of equipment and with a complete list of service contracts with said <br />agencies to perform these services. In addition to this list. The contractor shall submit for <br />review of the Architect and/or Contractor and submittal to the Owner for his files, copies of <br />service contracts with said agencies to perform these services. It shall be the responsibility of <br />this contractor to fill out forward and all warranty forms as required. <br />D. This contractor shall arrange demonstrations of the operation and maintenance of all buy-out' <br />equipment by competent instructors. These demonstrations to take place within ten (10) days <br />prior to the acceptance of the kitchen. All instruction periods shall be scheduled with the <br />Architect and/or Consultant fourteen (14) days prior to commencement of same, and at times <br />convenient to the Architect and/or consultant and Owner. <br />PART 4 ITEMIZED EQUIPMENT SCHEDULE <br />4.1 FOOD SERVICE EQUIPMENT LIST AND DESCRIPTION <br />A. Fabricated Equipment: Wherever the term "Fabricated Assembly" is used within the list noted <br />below and description of Food Service Equipment, it shall be presumed to be followed by the <br />phrase, "constructed to the configuration, dimension, detail and design as shown on the <br />drawings and specifications and with workmanship and materials as specified above" and shall <br />meet the fabrication detail requirements of the latest edition of the Sheet Metal and Air <br />Conditioning Contractors National Association (SMACNA), and National Sanitation Foundation <br />(NSF Standard 2). <br />12 <br />