My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PREFINISHED PLASTIC <br />LAMINATE CASEWORK <br />Section 12304 <br />15-1207 <br />1.07 REFERENCES AND STANDARDS <br />A. California Building Code (CBC), current edition, as adopted by the California Division of the <br />State Architect (DSA). <br />B. California Green Building Standards Code, current edition, as adopted by the California <br />Division of the State Architect (DSA). <br />C. Woodwork Institute (AWS), Manual (latest edition). <br />1.08 DELIVERY, STORAGE AND HANDLING <br />A. Deliver undamaged products to job in manufacturer's sealed containers and/or original <br />bundles with tags and labels intact. <br />B. Store materials in protected, dry conditions off of ground and in areas so as to not interfere <br />with the progress of the work. <br />C. Transport, store and handle in strict accordance with the manufacturer's recommendations. <br />D. Make delivery to job when notified by Contractor verifying that the job is ready to receive the <br />work of this Section and that arrangements have been made to properly store, handle and <br />protect such materials and work. <br />E. Do not deliver until wet operations in building are completed and storage area is closed in <br />and broom clean, with relative humidity 50% or less at 70 degrees F. <br />F. Deliver in sections to fit through openings. <br />1.09 PROJECT CONDITIONS <br />A. Products shall be available at project when required for installation so as not to delay job <br />progress. Installer for these products shall cooperate with installers performing work under <br />other sections involved to effect proper installation. <br />B. Casework fabricator shall coordinate installation of any Owner supplied equipment where <br />indicated on the Drawings. <br />1.10 FIELD MEASUREMENTS <br />A. Make and be responsible for all field dimensions necessary for proper fitting and completion <br />of work. Report discrepancies to Architect before proceeding. <br />PART 2 - PRODUCTS <br />2.01 MATERIALS <br />A. High Pressure Laminates (HPL): Wilsonart, Formica or approved equal in colors and <br />patterns as selected by Architect from manufacturer/suppliers' full product color range. There <br />will be no additional cost allowance for premium color selections, or for selection of different <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.