My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014470
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2600 - Land Use Program
>
PA-2100206
>
SU0014470
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 1:48:57 PM
Creation date
10/15/2021 3:55:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014470
PE
2638
FACILITY_NAME
PA-2100206
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205-
APN
15518002
ENTERED_DATE
10/14/2021 12:00:00 AM
SITE_LOCATION
1810 E HAZELTON AVE
RECEIVED_DATE
10/7/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
58. Neiahborhood Parks: <br />a. The neighborhood parks identified within Specific Plan II shall be dedicated to the <br />MHCSD with the first Final Map. Developer shall create a separate funding mechanism <br />for maintenance acceptable to MHCSD. Timing: Dedication shall be met with approval <br />of first Final Map of Neighborhood `I & J'; financing mechanism shall be completed and <br />adopted by the Board of Directors prior to the approval of the first Final Map. <br />b. Neighborhood Parks shall be designed consistent with all Community Approvals including <br />applicable provisions of the Parks, Recreation and Leisure Plan and the MHCSD Design <br />Manual. The design of the park shall be reviewed and approved by the MHCSD. Timing: <br />condition shall be met prior to approval of first Final Map. <br />c. Construction of `I' Neighborhood Park shall begin no later than the time at which 50% of <br />the dwelling units for the neighborhood have been issued a building permit. The Park <br />shall be completed no later than the time at which 80% of dwelling units for the <br />neighborhood have been issued building permits. Completion time may be modified by <br />the MHCSD General Manager to reflect construction, weather, budget, or other public <br />interest contingencies. <br />d. Construction of `J' Neighborhood Park shall begin no later than the time at which 50% of <br />the dwelling units for the neighborhood have been issued a building permit. The Park <br />shall be completed no later than the time at which 80% of dwelling units for the <br />neighborhood have been issued building permits. Completion time may be modified by <br />the MHCSD General Manager to reflect construction, weather, budget, or other public <br />interest contingencies. <br />59. Community Parks: implementing public improvement projects shall comply with all Community <br />Approvals including applicable provisions of the MHCSD Parks, Recreation and Leisure Plan and <br />the MHCSD Design Manual. <br />60. Proposed Dry Creek: <br />a. The Dry Creek Corridor shall be designed to comply with all Community Approvals and <br />shall conform with applicable development provisions of Mountain House Creek <br />Community Park. Timing: condition shall be met prior to approval of first Final Map. <br />b. Appropriate irrigation shall be provided continually along all edges within the upper <br />terrace areas of the linear Dry Creek Corridor to provide perennial 50 foot buffer subject <br />to State and Federal Requirements. <br />c. Site furniture, consistent with the common design theme of the neighborhood, shall be <br />incorporated into the Improvement Plans for the Dry Creek Corridor and shall be <br />consistent with the MHCSD Design Manual. The site furniture shall be a part of the Dry <br />Creek Corridor design plans and shall be reviewed and approved by MHCSD. <br />d. Construction of Dry Creek Improvements may be completed on a phased basis to <br />correspond with the development of neighborhood, or parcels as determined by MHCSD <br />directly adjacent to the facility. Dry Creek improvements to a specific segment shall be <br />completed no later than the time at which 80% of dwelling units for the neighborhood, or <br />adjacent parcels, have been issued building permits. Completion time may be modified <br />by the MHCSD General Manager to reflect construction, weather, budget, or other public <br />interest contingencies. <br />e. Masonry Walls or View Fencing, consistent with the MHCSD Design Manual and MHCSD <br />Standards, shall be constructed in all locations where residential properties abut Dry <br />Creek Corridor areas. No fencing may be permitted in locations where residences face <br />the Open Space as deemed appropriate by the MHCSD. Wall/Fencing Plans to be <br />consistent with all Community Approvals including applicable provisions of the MHCSD <br />Resolution Template 01/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.