Laserfiche WebLink
office for review & to address required items in order to obtain CUPA Permit/Approved Plans for <br />proposed installation of new ust's & related upgrades/improvements to be completed at the subject <br />facility (please download the files as soon as possible, the link never expires but when a long time goes <br />by without accessing/downloading the files with the link, they might no longer be available); <br />https://asengineering.sharefile.com/d-s22c983bf99724fd7bOcb5c459c72ecb9 <br />• Updated UST Installation Permit Application <br />• Manufacturer's cut sheets for proposed ust system components <br />• Updated plans for review/approval for proposed installation of new ust's & related <br />upgrades/improvements <br />Below please also find your latest plan check comments received highlighted in blue including our <br />responses highlighted in yellow; <br />1) Complete manufacturer certifications were not submitted. Provide current contractor's <br />training certifications for installation and testing of all proposed UST equipment/components, <br />including tanks & sumps, flex connectors, piping, spill buckets, sump shields & lids, leak <br />detectors, and overfill prevention. A number of the attached certifications have expired and <br />there is not a certification for each part being installed. Please follow the link to access <br />certifications received from contractor, if certifications are still not the correct ones, please <br />advise specifically which ones are acceptable & which ones you are still missing. <br />Certification for the following are still needed: <br />• NOV - piping <br />• Franklin Fueling/Flex-ing - flex connectors <br />• Hosemaster—flex connectors <br />• Franklin Fueling—spill containers <br />• Fiberlite— water -tight shield <br />• Veeder Root — leak detectors <br />Required certifications will follow shortly as soon as received from contractor Savidge <br />Construction Inc. <br />2) Provide manufacturer's cut sheets for all proposed UST system components, including piping, <br />flex connectors, STP & fill sumps, UDCs, vent sumps, penetrations, spill buckets, and overfill <br />prevention. l found a link in one of the emails but it says that it is an "invalid link". Please follow <br />the link to access manufacturer's cut sheets, if it still says that the link is invalid (which 1 checked <br />& was able to access again without any problem) we can overnight hard copies or a usb drive <br />including all plans & documents to your office, if manufacturer's cut sheets are still not the <br />correct ones, please advise specifically which ones are acceptable & which ones you are still <br />missing. <br />Cut sheets for the following were not submitted: <br />• tank STP sump and tank fill sump Included in the tank package. <br />• Under Dispenser Containment — The application lists B-925x-FXL BD -AB but that is not <br />one of the part numbers on the Bravo B-9000 cut sheet. This cut sheet also states that <br />this is a single walled UDC. Will you be installing a single walled UDC? We'll use double <br />wall (Bravo 89250-D36). Please see new cutsheet & revised sheet M.5.3.02 (Item #85). <br />• Electrical penetrations F -17 -RR -D and F -10 -RR -D - not listed on the Bravo cut sheet <br />submitted. F -17 -RR -D and F -10 -RR -D are old part #s. Please see new cutsheet & sheet <br />M.5.3.02 (Item #124) for new model #. <br />Franklin Fueling FFlOX12HMX346 flex connect is not listed on the Flex-ing Flex <br />Connector cut sheet. Or is the end of this part supposed to be "...F346"? Then it would <br />fit something on this cut sheet. The end of the model number should be M346. Please <br />see revised sheet M.5.3.02 (item #171). <br />17 <br />