Laserfiche WebLink
Technical Memorandum <br />Hartman King PC <br />13 March 2020 <br />1883010.00 <br />Page 3 <br />Kj Kennedy Jenks <br />Attorney Client Privilege/ <br />Attorney Work Product <br />associated soil samples were contained in stainless steel liners, with the ends covered with <br />TeflonTM sheets and plastic endcaps. Samples were transferred to Eurofins Calscience <br />(Eurofins). The results are included in Table 2 and the laboratory reports are included in <br />Attachment B. <br />Based on the Site walk observations and unconfirmed contents of the drums, American <br />Integrated Services, Inc. (AIS) (CSL #757133-HAZ) was subcontracted to place the two drums <br />in plastic overpacks and dispose of them in accordance with applicable regulations. AIS placed <br />the overpacks on the drums on 7 October 2019 and removed them from the Site on <br />26 November 2019. The waste manifest documenting disposal of these drums at the Crosby <br />and Overton, Inc. facility in Long Beach, California is included in Attachment C. <br />Soil Excavation <br />Soil samples indicated the presence of petroleum hydrocarbons in shallow soil around the <br />former drum locations at levels higher than the US EPA RSLs for medium and high -range <br />petroleum compounds (see Table 2 for carbon range). The impacted soil was removed as <br />described below. Figure 2 shows the footprint of the excavation based on the pre -excavation <br />sampling activities described above. <br />North State Earth and Water, Inc. (North State; CSL #882240-HAZ) was subcontracted to <br />excavate a pit approximately 8 feet by 5 feet in plan, to a depth of approximately 1 foot in the <br />southern half and 2 feet in the northern half. Upon completion of the excavation activities, <br />Kennedy Jenks observed that soil at the base and sidewalls of the excavation was unstained <br />and had no odor. North State backfilled the pit with locally -obtained aggregate base material <br />and compacted it using the tracks of their loader. Excavated soil and the oily, broken sheet of <br />plywood was placed on plastic sheeting and covered with plastic pending profiling and disposal. <br />The dimensions of the pit were determined based on the pre -excavation sample results; <br />therefore, no additional samples were collected from the pit. North State collected a sample <br />from the stockpile for profiling purposes. <br />North State received approval from the Waste Management Altamont Landfill and notified <br />Kennedy Jenks on 20 December 2019 that they would load and transport the soil. Kennedy <br />Jenks met North State onsite and confirmed the soil was loaded and the Site was restored. <br />Refer to Attachment A for a photographic record of the excavation activity. Soil profiling and <br />disposal documentation is included in Attachment D. <br />p1irv120180883010.00 hartman king - raymus matter115655 mitchell residenceltech memo12019_121components1200313 technical memorandum -15655 mitchell rd.docx © Kennedy Jenks Consultants, Inc. <br />