Laserfiche WebLink
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> ACL COMPLAINT NO. R5-2003-0159 <br /> ADMINISTRATIVE CIVIL LIABILITY <br /> IN THE MATTER OF <br /> COUNTY OF SAN JOAQUIN AND FOOTHILL SANITARY LANDFILL, INC. <br /> SAN JOAQUIN COUNTY <br /> This Administrative Civil Liability Complaint(hereafter Complaint) is issued to County of San Joaquin <br /> and Foothill Sanitary Landfill, Inc. (hereafter known jointly as "Discharger")based on a finding of <br /> failure to submit reports pursuant to California Water Code (CWC) Section 13267 and based on <br /> provisions of CWC Section 13267(b)(1) and Sections 13268(a) and(b),which authorize the imposition- <br /> of <br /> mpositionof an Administrative Civil Liability. <br /> The Executive Officer of the California Regional Water Quality Control Board, Central Valley Region <br /> (Regional Board) finds, with respect to the Discharger's acts, or failure to act, the following: <br /> 1. San Joaquin County owns and Foothill Sanitary Landfill, Inc. operates a Class III municipal solid <br /> waste landfall about 1 mile south of Shelton Road, in Section 12 and 13, T2N, R9E, MDB&M. <br /> 2. The facility is comprised of an 800-acre parcel (Assessors Parcel No. 093-44-01) containing a <br /> single Waste Management Unit. This Unit is comprised of two areas: LF-1 and LF-2. LF-1 <br /> contains a single, unlined module (referred to as "Module I"), covering approximately 80 acres. <br /> LF-2 is comprised of multiple lined modules, the first of which(Module 1) is planned for <br /> completion in 2003. <br /> 3. Waste Discharge Requirements (WDRs) Order No. R5-2003-020 was adopted by the Regional <br /> Board on 31 January 2003. The WDRs address the construction, operation, closure, and evaluation <br /> monitoring of the Class III landfill. <br /> HISTORY OF VIOLATIONS <br /> 4. On November 6, 2002, the Discharger submitted an Evaluation Monitoring Plan, which describes <br /> the criteria for delineating the nature and extent of groundwater pollution. Because Module"I"is <br /> unlined and assuredly the source of waste discharges, the WDRs require the closure of Module"I" <br /> as part of the corrective action measures. <br /> 5. WDRs Order No. R5-2003-020, Provision J.12,requires that the Discharger submit on 1 June <br /> 2003, the Engineering Feasibility Study report, including a Closure Plan for Module "I". The <br /> Discharger did not submit the document by the date of compliance. <br /> 6. On 16 September 2003, the Executive Officer issued a CWC 13267 Order requiring the <br /> Discharger to submit two reports, including(a) the Engineering Feasibility Study report, including <br /> the Closure of Module "P',required by the WDRs and(b) a Partial Cover workplan, which <br />