My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2007-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:07:13 AM
Creation date
1/4/2022 2:21:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2007-2009
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRV Page 2 of 2 <br />(a) <deleted for brevity> <br />(b) The EA -shall evaluate and, if it complies with the requirements of §§20921-20939 to the satisfaction of the <br />EA, approve a gas monitoring and control program plan submitted by the disposal site operator. The EA shall <br />act upon the submittal by approving, denying, or requesting additional information within 60 days of receipt of <br />the submittal. Within 5 days from the date of approval, the EA shall submit the approved gas monitoring and <br />control program plan to the CIWMB. The CIWMB shall evaluate and, if it complies with the requirements of <br />§§20921-20939 to the satisfaction of the CIWMB, concur with a gas monitoring and control program plan <br />submitted by the EA. CIWMB shall act upon the submittal by concurring, denying, or requesting additional <br />information within 60 days of receipt of the submittal; if the CIWMB does not act upon the submittal within 60 <br />days, the submittal will be deemed to have been concurred with. <br />(1) New disposal sites and lateral expansions of existing disposal sites shall comply with these regulations <br />prior to receipt of waste in the new or expanded area. <br />(2) Except as provided in subdivision (A) hereof, disposal sites which have received their final shipment of <br />waste shall comply with these regulations immediately <br />(A) Disposal sites for which the EA, RWQCB, and CIWMB approved a final closure plan on or before <br />September 20, 2007 shall comply with these regulations immediately, except that §20925(c)(1) (depth <br />requirement) only applies with respect to any new wells or probes that are installed or existing wells or probes <br />that are modified and only when such wells or probes are installed or modified. The depth of these new wells <br />and modified existing wells shall comply with §20925(c)(1), unless an alternative depth is approved pursuant to <br />§20925(c)(2). <br />1/8/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.