Laserfiche WebLink
IRV Page 2 of 2 <br />(a) <deleted for brevity> <br />(b) The EA -shall evaluate and, if it complies with the requirements of §§20921-20939 to the satisfaction of the <br />EA, approve a gas monitoring and control program plan submitted by the disposal site operator. The EA shall <br />act upon the submittal by approving, denying, or requesting additional information within 60 days of receipt of <br />the submittal. Within 5 days from the date of approval, the EA shall submit the approved gas monitoring and <br />control program plan to the CIWMB. The CIWMB shall evaluate and, if it complies with the requirements of <br />§§20921-20939 to the satisfaction of the CIWMB, concur with a gas monitoring and control program plan <br />submitted by the EA. CIWMB shall act upon the submittal by concurring, denying, or requesting additional <br />information within 60 days of receipt of the submittal; if the CIWMB does not act upon the submittal within 60 <br />days, the submittal will be deemed to have been concurred with. <br />(1) New disposal sites and lateral expansions of existing disposal sites shall comply with these regulations <br />prior to receipt of waste in the new or expanded area. <br />(2) Except as provided in subdivision (A) hereof, disposal sites which have received their final shipment of <br />waste shall comply with these regulations immediately <br />(A) Disposal sites for which the EA, RWQCB, and CIWMB approved a final closure plan on or before <br />September 20, 2007 shall comply with these regulations immediately, except that §20925(c)(1) (depth <br />requirement) only applies with respect to any new wells or probes that are installed or existing wells or probes <br />that are modified and only when such wells or probes are installed or modified. The depth of these new wells <br />and modified existing wells shall comply with §20925(c)(1), unless an alternative depth is approved pursuant to <br />§20925(c)(2). <br />1/8/2009 <br />