My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2016-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:07:34 AM
Creation date
1/7/2022 10:13:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2016-2017
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B Abandoned borings shall be backfilled in the presence of the EHD inspector with neat <br />cement within two days. <br />C Settlement of abandoned boring(s) shall be backfilled again with neat cement to <br />adjacent ground surface. <br />PART IV. SOIL GAS WELL INSTALLATION <br />4.01 GENERAL <br />A Contractor shall install the soil gas wells in the presence of the EHD inspector. <br />B Any boring that collapses during well installation shall be re -drilled to the specified <br />depth at no additional cost to the County. <br />4.02 PROBE PIPE ASSEMBLY <br />A Measure the depth of the well drilled from surrounding grade in the presence of the <br />Engineer and EHD inspector before probe pipe installation. <br />B Couplings shall not be used to join probe pipe. All joints shall be flush threaded. <br />C Contractor shall complete assembly of the probe pipe with the perforated sections per <br />the dimensions shown on the well schedule. <br />D Maintain the probe pipe identification throughout the work. Identify each probe pipe by <br />placing required colored duct tape per color code on top of the probe pipe. <br />E Place a PVC end cap on the top end of probe pipe and secure it by screwing SS No. 6 <br />screws. <br />F Insert each probe pipe carefully into the well borehole. <br />G Do not bend or kink the probe pipe. <br />H Probe pipes shall be installed to a near -straight position in the borehole. Check the <br />straightness of the probe pipe in the borehole with a flashlight. <br />I Probe pipe color schedule: Shallow -Red, Intermediate -Blue, Deep -Yellow. <br />FH-LFG System Upgrade Phase 1 Section 01730 Page 25 <br />Technical Specifications Soil Gas Well <br />
The URL can be used to link to this page
Your browser does not support the video tag.