My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2016-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:07:34 AM
Creation date
1/7/2022 10:13:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2016-2017
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ll <br />4.03 BACKFILLING <br />A The depth and length of the pea gravel sampling zones may be adjusted by the <br />Engineer based on geologic data obtained during drilling. <br />B Place backfill materials'in a controlled manner to avoid bridging, overfilling the boring, <br />or damaging the probe pipes. <br />C Periodically measure depths of pea gravel backfill from the existing grade level with a <br />weighted measuring tape. <br />D Measure the top of pea gravel depth of each pipe probe from surrounding grade with a <br />weighted measuring tape in the presence of the EHD inspector and the Engineer. <br />E Place the bentonite plug as identified in the soil gas well details on the plans. <br />F Measure the top depth of each bentionite plug from surrounding grade with a weighted <br />measuring tape in the presence of the EHD inspector and the Engineer. Adequately <br />hydrate bentonite plug per manufacturer's recommendations. Allow 30 minutes for <br />bentonite plug to hydrate. <br />G Provide the quantity of bentonite bags used for each bentonite plug to the Engineer. <br />H Install well enclosure after hydrating the upper bentonite layer. If left overnight, <br />protect the bore hole from soil falling into the hole. <br />I Maintain probe pipe spacing inside the well enclosure as shown in the plans. <br />4.04 PROBE PIPE COCK VALVE INSTALLATION. <br />A Probe pipe cock valve shall be installed after the well enclosure. <br />B Cut probe pipes to install probe pipe cock valves. When installed, probe pipe cock <br />valves shall have clearance from the top of the well enclosure lid as specified in the <br />well enclosure details. <br />C Install color coded Polyethylene tubing inside the corresponding probe pipe. <br />D Install PVC fittings on probe pipe as shown on the soil gas well figures. Apply Teflon <br />tape on all threaded fittings. All fittings shall be secure and tight. <br />E Connect Polyethylene tubing to the cock valve and then install cock valve on probe <br />pipe. <br />FH-LFG System Upgrade Phase 1 Section 01730 Page 26 <br />Technical Specifications Soil Gas well <br />
The URL can be used to link to this page
Your browser does not support the video tag.