My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0083203_SSNL (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
6631
>
2600 - Land Use Program
>
SR0083203_SSNL (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 2:08:19 PM
Creation date
2/10/2022 1:58:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0083203
PE
2602
FACILITY_NAME
6631 S JACK TONE RD
STREET_NUMBER
6631
Direction
S
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
18108017
ENTERED_DATE
1/25/2021 12:00:00 AM
SITE_LOCATION
6631 S JACK TONE RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Soil Suitability and Nitrate Loading Study <br />FAIST PROPERTY <br />6631 South Jack Tone Road, Stockton, California <br /> <br />TABLE OF CONTENTS <br /> <br /> <br />SECTION PAGE <br /> <br />9.0. IMPACT OF NITRATE TO GROUNDWATER .................................................... 10 <br />9.1. CURRENT OFF-SITE SOURCES OF NITRATE ............................................. 10 <br />9.2. IMPACT OF RAINFALL CONTRIBUTION TO NITRATE LOAD ...................... 11 <br />9.3. CURRENT ON-SITE SOURCES OF NITRATE ............................................... 11 <br />9.4. FUTURE ON-SITE SOURCES OF NITRATE .................................................. 11 <br />9.5. DENITRIFICATIONS CAUSED BY SOILS....................................................... 12 <br />9.6. MASS BALANCE OF NITROGEN LOADING .................................................. 12 <br />9.7. IMPACT OF NITROGEN LOADING FROM SITE PROJECT TO <br />DOWNGRADIENT WATER SOURCES ........................................................... 13 <br />10.0. TOTAL NITRATE IMPACT FROM PROPOSED PROJECT ............................... 13 <br />11.0. MITIGATION METHODS PROPOSED ............................................................... 14 <br />12.0. CONCLUSIONS AND RECOMMENDATIONS ................................................... 14 <br />13.0. LIMITATIONS ..................................................................................................... 14 <br /> <br /> <br />FIGURES <br /> <br />Figure 1 – Location Map <br />Figure 2 – Site Plan <br /> <br /> <br />APPENDICES <br /> <br />Appendix A – Parcel Vicinity Map/Air Photo and Information <br />Appendix B – Onsite Well/Septic Permit <br />Appendix C – Percolation Test Sheet/ Onsite Wastewater Treatment System Permit - <br /> Percolation Test <br />Appendix D – CIMIS Rain Evapotranspiration Report 2014-2019 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.