My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007720
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
34443
>
2600 - Land Use Program
>
PA-0500847
>
SU0007720
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2024 8:24:32 AM
Creation date
3/18/2022 8:44:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007720
PE
2605
FACILITY_NAME
PA-0500847
STREET_NUMBER
34443
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
Zip
95304-
APN
25328002
ENTERED_DATE
5/12/2009 12:00:00 AM
SITE_LOCATION
34443 S BIRD RD
RECEIVED_DATE
3/15/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
soil conditions anticipated in the slope stability analysis and identify soil conditions at the site that <br /> would decrease the anticipated stability factors of safety. Proof of compliance with this measure <br /> shall be provided to Public Works as part of the annual review process. <br /> j. For the periodic slope stability analysis, triaxial testing is required in addition to UCS testing until <br /> such time that the applicant's geotechnical consultant submits documentation showing the <br /> correlation between the two test methods. <br /> k. Implement Final EIR mitigation measure 4.2-3(a). The reclaimed slopes shall be compacted to at <br /> least 90 percent relative compaction and should not be steeper than 1.5:1, unless otherwise <br /> recommended by a geotechnical consulting firm under contract with the County and Public Works. <br /> I. A 50-foot setback from the eastern edge of the State of California drainage easement in Phase B <br /> will be maintained until such time as a revised easement has been recorded. <br /> m. At pipeline easement crossing points, the applicant will place three feet of compacted overburden <br /> over the pipeline. <br /> n. All private roads involved in an excavation shall be maintained so as to control dust. <br /> o. The applicant shall maintain Bird Road along its haul route to a condition acceptable to San Joaquin <br /> County.A cash deposit or security in the amount and form acceptable to Public Works shall be filed <br /> with the Department with a guarantee that if the permittee fails, refuses, or neglects to repair, under <br /> permit, any damages to Bird Road along the haul route that may result from permittee's operation, <br /> Public Works may do the work necessary to restore Bird Road along the haul route to equal or <br /> better than original condition, using the funds from said cash deposit or security. As an alternative, <br /> an in-lieu annualized maintenance fee may be acceptable to Public Works. An application for the <br /> in-lieu fees may be made to Public Works. As an additional alternative, a Joint Maintenance <br /> Agreement shall be fully executed for the applicant's fair share in conjunction with other applicable <br /> quarry operators to ensure that Bird Road is maintained to a condition acceptable to San Joaquin <br /> County. (Development Title Section 9-854.3) <br /> p. Loads on all public roads shall be required to legal loads only. (Street and Highway Title Section <br /> 10-2350) <br /> q. The Traffic Impact Mitigation Fee shall be required for this development.The fee is due and payable <br /> at the time of approval of the site improvement plan. The fee currently is$233.15 per trip end in the <br /> Tracy area. The fee will be based upon 640 trip ends. The fee shall be automatically adjusted July <br /> 1 of each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record. (Resolution R-00-339) <br /> r. The Regional Traffic Impact Fee shall be required for this development. The fee is due and payable <br /> at the time of approval of the site improvement plan. The fee currently is $830.00 per 1,000 <br /> equivalent gross square foot of building. The fee is based on the current schedule. (Resolution R- <br /> 06-38) <br /> 3. ENVIRONMENTAL HEALTH DEPARTMENT(Contact: [209]468-3420) <br /> a. The applicant shall submit to Environmental Health an annual report on the status of water supply <br /> wells around the general perimeter of the permitted mining areas. A copy of the annual report shall <br /> be submitted to the Community Development Department and affected property owners. <br /> b. In the event the applicant is unable to obtain or retain the required water wells for water quality <br /> testing, the applicant shall procure new wells for monitoring purposes at locations acceptable to <br /> Environmental Health. The wells to be tested for groundwater quality shall, at a minimum, be tested <br /> PA-0500847—Conditions of Approval and Monitoring and Mitigation Reporting Plan 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.