My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COVEGSHNN (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3031
>
2500 – Emergency Response Program
>
COVEGSHNN (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 4:03:04 PM
Creation date
3/23/2022 3:55:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2500 – Emergency Response Program
RECORD_ID
COVEGSHNN
PE
2546
STREET_NUMBER
3031
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
14502007
ENTERED_DATE
1/12/2021 12:00:00 AM
SITE_LOCATION
3031 NAVY DR
RECEIVED_DATE
1/12/2021 12:00:00 AM
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\ymoreno
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
View images
View plain text
Complaint Investigation Summary Report #: 5105 <br />COMPLAINT ID: COVEGSHNN Site Location: 3031 NAVY DR <br />Activity Summary <br />Activity Date Recorded by <br />01/12/2021 Emailed spill details to both Program Coordinator Melissa Nissim and Lead Senior MURO <br />Elena Manzo. <br />Updated Elena Manzo and Program Coordinator Melissa Nissim, after my site visit <br />to spill area. <br />01/13/2021 Discussed spill confirmation sampling with C. Muro, EHD inspector. No Cal OES <br />spill report was received to date, facility indicated yesterday that a report was <br />made asked Claudia Muro to check on it with the facility. <br />MANZO <br />Received a call from Jeff Tierney, discussed confirmation sampling, Jeff <br />requested to be updated on the clean up progress, he indicated that nitrates and <br />ammonium analyses sounded appropriate for this case. <br />01/13/2021 Discussed complaint with Elena regarding how will the site cleanup be deemed <br />clean, since pH of CN-9 is between 5-7 pH. She stated the facility or cleanup <br />contractor will need to determine. <br />MURO <br />After my return updated Elena and Melissa on cpill cleanup status. <br />Discussed issue with the dilute fertilizer liquid with Elena Manzo. She told me they <br />need to provide information on whether the liquid has been assessed. <br />01/13/2021 Went to spill site to verify cleanup. Met with Michael Anderson (Yara) and MURO <br />Jonathan (Yara). <br />Added property owner information from Parcel Viewer to complaint information on <br />Envision Connect. <br />Completed Prop 65, Emergency Response Record, and site map. <br />Emailed the Prop 65 to Lead Senior Elena Manzo for review. <br />01/14/2021 Made revision to Prop 65 and took to Elena Manzo for final review. MURO <br />Submitted Prop 65 to office assistant for mailing. <br />Updated Melissa and Elena. <br />Discussed dilute fertilizer with Elena. <br />01/14/2021 Witnessed confirmation sampling performed by McCampbell Analytical, Inc. MURO <br />Sample 1: Taken from the center of the drainage pond. <br />Sample 2: Taken from the edge of the drainage pond where the outlet drains into <br />the pond. <br />I did not witness the samples taken from the waste soil generated from cleanup <br />which are listed as follows: <br />Sample 3: Taken from bin on the door side. <br />Sample 4: Taken from bin on the tank side. <br />Left site after sampling. <br />5105.rpt Page 2 of 6
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).