PLUMBING SPECIFICATIONS 2. BACKFILLING:
<br />PERFORM ALL NECESSARY EXCAVATING AND BACKFILLING REQUIRED FOR THIS INSTALLATION. PREPARE A
<br />(;FNFRAI PROPER BED OF SAND OR GRAVEL OR EQUIVALENT IN ROCK SCREENINGS SO AS TO ELIMINATE SHIMMING
<br />A. THE GENERAL CONDITIONS OF THE GENERAL SPECIFICATIONS, ALONG WITH ALL APPLICABLE AND VOID SPACES UNDER ANY OF THE UTILITY SERVICE PIPES. BENDING OF ANY HARD PIPE WILL NOT BE
<br />INSTRUCTIONS TO BIDDERS SHALL FORM A PART OF THIS SECTION OF THE SPECIFICATIONS. PERMITTED. WHERE A CHANGE IN DIRECTION IS NECESSARY ON PRESSURE PIPES, "COMPATIBLE" COUPLINGS
<br />OR EQUAL SHALL BE USED AND BENDS MAY NOT EXCEED 90 DEGREES. ALL EXCAVATION BELOW THE
<br />B. REFERENCE IS MADE TO REQUISITES FOR BIDDERS AND CONTRACTORS UNDER OTHER BOTTOM OF FOOTINGS SHALL BE BACKFILLED WITH 2000 PSI CONCRETE. OTHER BACKFILL SHALL CONSIST
<br />SECTIONS OF THESE SPECIFICATIONS, WHICH SHALL BE CONSIDERED BINDING, UNLESS OF 2-3" OF SAND OR ROCK SCREENINGS AND EARTH TO A FINAL LEVEL EQUAL TO ITS ORIGINAL CONDITION. PLAN
<br />OTHERWISE NOTED UNDER THIS SECTION. IN THE EVENT THE BACKFILL. SHOULD SETTLE BEFORE THE FINAL TOP SURFACE IS APPLIED, APPLY TAG
<br />ADDITIONAL BACKFILL TO SUSTAIN THE ORIGINAL LEVEL. CARE SHOULD BE TAKEN TO MINIMIZE THE DUST
<br />LEVEL WHEN EXCAVATING AND BACKFILLING SO AS TO COMPLY WITH FEDERAL AND STATE E.P.A. REGULATIONS
<br />PLUMBING FIXTURE SCHEDULE
<br />FIXTURE DATA I CONNECTION DATA
<br />PROVIDED SOIL VENT TRAP INDIRECT WATER
<br />FIXTURE QTY. MFG. BY SIZE SIZE WASTE
<br />COLD HOT TW FILTER
<br />SCOPEWATER
<br />EACH CONTRACTOR SHALL THOROUGHLY ACQUAINT HIMSELF WITH THE CONSTRUCTION DETAILS, BOTH AS
<br />RELATING TO THIS TYPE OF WORK (FUGITIVE DUST).
<br />WC -1
<br />CLOSET
<br />HANDICAPPED
<br />ON TENANT CONSTRUCTION DRAWINGS AND LANDLORD'S AS REFERRED TO, BEFORE SUBMITTING HIS BID
<br />2"
<br />AMERICAN
<br />STANDARD
<br />6590.503
<br />GENERAL
<br />CONTRACTOR
<br />AS NO ALLOWANCES WILL BE MADE BECAUSE OF THE CONTRACTOR'S UNFAMILIARITY WITH THESE 3.
<br />PIPING INSTALLATION:
<br />BE Ir ON MINIMUM O THOUGHP LINES EVEN OT SHOWN ON THE
<br />A. 0. SMITH
<br />DETAILS, ALL PERFORMANCE OF CONSTRUCTION SHALL BE AS REQUIRED BY THE PACE OF THE
<br />LINTS.
<br />ERN -OUTS MUST
<br />MAKING REDUCTIONSLED
<br />NSIZE OF PIPE. REAM ALL PIPE AFTER CUTTING, THEN
<br />USE REDUCING FITTINGS
<br />LAV
<br />LAVATORY
<br />GENERAL CONSTRUCTION.
<br />TURN PIPES ON END AND KNOCK OUT ALL LOOSE DIRT AND SCALE BEFORE INSTALLING. MAKE CHANGES IN
<br />J.R. SMITH
<br />3450 SERIES
<br />GENERAL
<br />CONTRACTOR
<br />3
<br />HORIZONTAL DIRECTION OF SOIL AND WASTE PIPES WITH LONG RADIUS FITTINGS OR WITH 'Y" BRANCHES AND
<br />7
<br />1/2"
<br />PRECISION
<br />PLUMBING
<br />PRODUCTS
<br />GENERAL
<br />CONTRACTOR
<br />INSPECTION OF SITE
<br />THAT CONTRACTOR IS FAMILIAR WITH JOB SITE CONDITIONS AND
<br />1/8 OR 1/16 BENDS. CONNECT SOIL STACKS AT BASE TO HORIZONTAL RUNS WITH 'Y" CONNECTIONS.
<br />5
<br />ALL PROPOSALS SHALL PRECLUDE
<br />UTILITY LOCATIONS AND THE LACK OF SPECIFIC INFORMATION ON THE DRAWINGS SHALL NOT RELIEVE
<br />WASTE PIPES FROM FIXTURES SHALL BE CENTERED IN THE PROPER
<br />UR
<br />URINAL
<br />THE CONTRACTOR OF ANY RESPONSIBILITY.
<br />WATER SUPPLY PIPES TO FIXTURES AND
<br />PLACE RELATIVE TO THE CENTER LINE OF THE FIXTURE. NO OFFSETS WILL BE ALLOWED. ALL PIPES SHALL
<br />CODES AND REGULATIONS
<br />SUBCONTRACTOR SHALL COMPLY WITH ALL LAWS, ORDINANCES, RULES AND REGULATIONS BEARING
<br />---
<br />AND LOCAL CODES AND SOLDERED AS LISTED BELOW. FLUX SHALL BE NON -CORROSIVE.
<br />WH
<br />EACH
<br />ON THE CONDUCT OF THE WORK AS DRAWN OR SPECIFIED. IF A SUBCONTRACTOR OBSERVES THAT
<br />PROMPTLY NOTIFY THE GENERAL
<br />BE RUN MECHANICALLY STRAIGHT AND SQUARE WITH BUILDING LINES, EXCEPT FOR REQUIRED PITCH ON
<br />FD
<br />FLOOR DRAIN
<br />PERMITS
<br />PERMITS AND LICENSES NECESSARY FOR THE PROPER EXECUTION OF THE WORK SHALL BE
<br />HORIZONTAL LINES, AND ALL CHANGES IN DIRECTION SHALL BE MADE WITH FITTINGS. WATER PIPING TO BE
<br />NOTED. WHERE WATER
<br />ABOVE
<br />DESCRIBED ABOVE. UNDER NO CIRCUMSTANCES SHALL DISSIMILAR METALS COME INTO DIRECT CONTACT WITH
<br />1/2' @ 16'
<br />ALL
<br />SECURED AND PAID FOR BY THE SUBCONTRACTOR INVOLVED.
<br />ROUTED IN WALLS, UNDER THE FLOOR SLAB, AND ABOVE SUSPENDED CEILINGS AS
<br />JOINTS SHALL BE MADE UNDER THE SLAB
<br />COPPER TUBING; E.G., GALVANIZED STRAPPING, HANGERS, OR CLAMPS TO SECURE THE TUBING.
<br />E
<br />IT TO BE CONTRARY
<br />OUT
<br />---
<br />LINES ARE ROUTED UNDER THE FLOOR SLAB, NO MECHANICAL
<br />EXCEPT AS LISTED BELOW. WATER PIPING SHALL BE INSTALLED NOT TO EXERT VERTICAL NOR HORIZONTAL
<br />NOTICE, THE SUBCONTRACTOR SHALL BEAR ALL COSTS ARISING THEREFROM.
<br />CHEMICAL DISPENSER
<br />('ODE REQUIREMENTS
<br />UNDER THIS CONTRACT SHALL COMPLY WITH THE PROVISIONS OF THE SPECIFICATIONS,
<br />STRESSES ON THE SEATING OF UNIONS. UNIONS SHALL BE COPPER TYPE NIBCO # 733 OR EQUAL. PROVIDE
<br />FS
<br />FLOOR SINK
<br />ALL WORK
<br />BY THE OWNER, AND SHALL SATISFY ALL APPLICABLE CODES, ORDINANCES,
<br />AIR CHAMBER TYPE WATER HAMMER ARRESTORS OR ACCEPTABLE FACTORY MANUFACTURED SUBSTITUTES AT
<br />A. EACH SUBCONTRACTOR SHALL CONTINUOUSLY MAINTAIN ADEQUATE PROTECTION OF ALL HIS
<br />DRAWINGS OR AS DIRECTED
<br />OR REGULATIONS OF THE GOVERNING BODIES, WHETHER SO SHOWN OR NOT, AND ALL MODIFICATIONS
<br />ALL WATER ROUGH -IN LOCATIONS.
<br />WORK FROM DAMAGE AND SHALL PROTECT THE OWNER'S PROPERTY FROM INJURY OR LOSS
<br />TRAP
<br />REQUIRED BY SUCH AUTHORITIES SHALL BE MADE BY THE CONTRACTOR WITHOUT ANY ADDITIONAL COST
<br />WILL BE PERMITTED. CRACKED FITTINGS SHALL BE REMOVED AND REPLACED
<br />TP
<br />PRIMER
<br />TO THE OWNER.
<br />NO WAX, PUTTY, OR VARNISH
<br />WITH NEW FITTINGS. MAKE THREADED JOINTS IN BRASS PIPE AND FITTINGS WITH PIPE THREADING TO THE
<br />EXCEPT SUCH AS MAY BE DIRECTLY DUE TO CAUSES BEYOND HIS CONTROL AND NOT TO
<br />UNIONS.
<br />FITTINGS. NO SLIP JOINTS OR COUPLING JOINTS IN BRASS PIPE WILL BE PERMITTED,
<br />HIS FAULT OR NEGLIGENCE. HE SHALL ADEQUATELY PROTECT ADJACENT PROPERTY AS WELL.
<br />BAG -N -BOX
<br />S AND WORKMANSHIP
<br />SHOULDER OF THE
<br />---
<br />------
<br />DESCRIPTION
<br />AMERICAN GENERALADA COMPLIANT, ELONGATED BOWL, WITH SLOAN 111-1.28 MANUAL FLUSH VALVE,
<br />3 STANDARD 4" 2" INTEGRAL------ 1 " --- --- ---
<br />CONTRACTOR 1.28 GPF, SEAT: BEAMIS #1955C OPEN FRONT, WHITE.
<br />2857.128
<br />AMERICAN GENERA4" CENTERS WALL MOUNTED, CHICAGO 333-E2805-665PSHAB
<br />L
<br />2 STANDARD CONTRACT1-1/2 1-1/2" 1-1/2" ----- 1/2" --- 1/2" --- FAUCET. .5 GPM.
<br />MATERIAL
<br />A. ALL MANUFACTURED ARTICLES, MATERIALS, AND EQUIPMENT SHALL BE APPLIED AS EXCEPT ON THE FIXTURE SIDE OF THE TRAP. THERMOSTATIC POWERS GENERAL -- -_-
<br />CTURERS AND UNLESS OTHERWISE SPECIFIED SHALL BE NEW, TMV-1 MIXING VALVE 6 LFe480-00 CONTRACTOR -
<br />RECOMMENDED BY Inc MANUFA
<br />FREE FROM ANY DEFECTS. ALL LIKE MATERIALS USED SHALL BE OF THE SAME
<br />0356.421
<br />NATURAL GAS PIPING:
<br />GENERAL
<br />CONTRACTOR
<br />AND
<br />MANUFACTURE AND QUALITY UNLESS OTHERWISE SPECIFIED.
<br />2"
<br />AMERICAN
<br />STANDARD
<br />6590.503
<br />GENERAL
<br />CONTRACTOR
<br />2
<br />2
<br />1
<br />A. 0. SMITH
<br />J.R. SMITH
<br />2005 SERIES
<br />GENERAL
<br />CONTRACTOR
<br />3"
<br />2"
<br />7
<br />rrvs�a
<br />J.R. SMITH
<br />3450 SERIES
<br />GENERAL
<br />CONTRACTOR
<br />3
<br />2
<br />7
<br />1/2"
<br />PRECISION
<br />PLUMBING
<br />PRODUCTS
<br />GENERAL
<br />CONTRACTOR
<br />___
<br />INTEGRAL
<br />5
<br />DRAIN
<br />FCO
<br />GRUNDFOS MODEL UP -15, SET PUMP TO PROVIDE A MAXIMUM OF 2 GPM THRU THE
<br />5.
<br />WATER PIPE:
<br />JOINTS SHALL BE CLEANED AND DEBURRED AS RECOMMENDED BY THE MANUFACTURER AND FEDERAL, STATE,
<br />MATERIAL
<br />A. ALL MANUFACTURED ARTICLES, MATERIALS, AND EQUIPMENT SHALL BE APPLIED AS EXCEPT ON THE FIXTURE SIDE OF THE TRAP. THERMOSTATIC POWERS GENERAL -- -_-
<br />CTURERS AND UNLESS OTHERWISE SPECIFIED SHALL BE NEW, TMV-1 MIXING VALVE 6 LFe480-00 CONTRACTOR -
<br />RECOMMENDED BY Inc MANUFA
<br />FREE FROM ANY DEFECTS. ALL LIKE MATERIALS USED SHALL BE OF THE SAME
<br />4.
<br />NATURAL GAS PIPING:
<br />GENERAL
<br />CONTRACTOR
<br />AND
<br />MANUFACTURE AND QUALITY UNLESS OTHERWISE SPECIFIED.
<br />2"
<br />FOR ABOVEGROUND INSTALLATIONS, ALL FITTINGS TO BE JOINED WITH TEFLON TAPE SEAL OR OTHER
<br />NFPA 54. UNIONS
<br />14
<br />J.R. SMITH
<br />4020 SERIES
<br />GENERAL
<br />CONTRACTOR
<br />SUITABLE SEAL AND MADE IN CONFORMANCE WITH THE BEST PRACTICES OF AGA AND
<br />A. 0. SMITH
<br />WORK UNDER THIS CONTRACT SHALL BE PERFORMED BY COMPETENT WORKMEN AND
<br />3
<br />SHALL BE CAST BLACK IRON AND INSTALLED IN A MANNER SUCH THAT NO STRESS WILL BE PLACED ON THE
<br />WCO
<br />B. ALL
<br />IN A NEAT AND WORKMANLIKE MANNER. WORK SHALL BE PROPERLY PROTECTED
<br />rrvs�a
<br />MALE-FEMALE SEALING SURFACES. PROPER ALIGNMENT WILL BE MADE AT TIME OF INSTALLATION. ALL JOINTS
<br />�oMm�
<br />EXECUTED
<br />DURING CONSTRUCTION, AND ON COMPLETION, THE INSTALLATION SHALL BE THOROUGHLY
<br />---
<br />AND CONNECTIONS SHALL BE THOROUGHLY CLEANED OF OIL, THREAD CUTTINGS AND RESIDUALS TO ACCEPT
<br />1/2"
<br />CLEANED AND ALL DEBRIS PRESENT AS A RESULT OF THIS CONTRACT SHALL BE REMOVED
<br />---
<br />ENAMEL PAINT. ROUGH OR SHARP EXPOSED THREAD SURFACES SHALL BE FILED SMOOTH.
<br />INTEGRAL
<br />FROM THE PREMISES, D2 NQI JUST ABANDON.
<br />DRAIN
<br />FCO
<br />GRUNDFOS MODEL UP -15, SET PUMP TO PROVIDE A MAXIMUM OF 2 GPM THRU THE
<br />5.
<br />WATER PIPE:
<br />JOINTS SHALL BE CLEANED AND DEBURRED AS RECOMMENDED BY THE MANUFACTURER AND FEDERAL, STATE,
<br />---
<br />CODES AND REGULATIONS
<br />SUBCONTRACTOR SHALL COMPLY WITH ALL LAWS, ORDINANCES, RULES AND REGULATIONS BEARING
<br />---
<br />AND LOCAL CODES AND SOLDERED AS LISTED BELOW. FLUX SHALL BE NON -CORROSIVE.
<br />WH
<br />EACH
<br />ON THE CONDUCT OF THE WORK AS DRAWN OR SPECIFIED. IF A SUBCONTRACTOR OBSERVES THAT
<br />PROMPTLY NOTIFY THE GENERAL
<br />THERMOSTATIC WATER MIXING VALVE MODEL LFL495, INTEGRAL COMBINATION CHECK
<br />GRADE - WHERE FITTINGS ARE SOLDERED BOTH FITTINGS AND TUBING SHALL BE CLEANED AS
<br />SYSTEM AT 10 FT. HEAD PLUS PIPING LOSSES, 115V, .022 AMPS, 25 WATTS, 1/25 HP.,
<br />THE DRAWINGS AND SPECIFICATIONS ARE AT A VARIANCE, HE SHALL
<br />WRITING. IF ANY SUBCONTRACTOR PERFORMS ANY WORK KNOWING
<br />1/2"
<br />ABOVE
<br />DESCRIBED ABOVE. UNDER NO CIRCUMSTANCES SHALL DISSIMILAR METALS COME INTO DIRECT CONTACT WITH
<br />1/2' @ 16'
<br />CONTRACTOR AND THE TENANT IN
<br />TO LAWS, ORDINANCES, RULES AND REGULATIONS AND WITHOUT GIVING SUCH
<br />---
<br />COPPER TUBING; E.G., GALVANIZED STRAPPING, HANGERS, OR CLAMPS TO SECURE THE TUBING.
<br />E
<br />IT TO BE CONTRARY
<br />OUT
<br />---
<br />MINIMUM OF .5 GPM TO MAX 12 GPM, BRONZE BODY, INTEGRAL FILTER WASH, CHECK
<br />NOTICE, THE SUBCONTRACTOR SHALL BEAR ALL COSTS ARISING THEREFROM.
<br />CHEMICAL DISPENSER
<br />BELOW GRADE, OR FLOOR SLAB ON EARTH OR STONE FILL -HIGH TEMPERATURE, SOLDER, 1200 DEG. F
<br />PROTECTION OF WORK AND PROPERTY
<br />OR GREATER MELTING POINT.
<br />A. EACH SUBCONTRACTOR SHALL CONTINUOUSLY MAINTAIN ADEQUATE PROTECTION OF ALL HIS
<br />BE PROPERLY SECURED AND ALIGNED SO AS NOT TO EXERT VERTICAL OR
<br />WORK FROM DAMAGE AND SHALL PROTECT THE OWNER'S PROPERTY FROM INJURY OR LOSS
<br />CAST IRON CAULKING FERRULE WITH BRASS RAISED HEAD PLUS POLISHED NIKALOY OR
<br />NOTE: WATER PIPE TO
<br />OF THE MATING (MALE AND FEMALE) SURFACES OF THE
<br />------
<br />ARISING FROM HIS WORK. HE SHALL MAKE GOOD ANY SUCH DAMAGE, INJURY, OR LOSS,
<br />---
<br />HORIZONTAL STRESSES ON THE SEATING
<br />---
<br />EXCEPT SUCH AS MAY BE DIRECTLY DUE TO CAUSES BEYOND HIS CONTROL AND NOT TO
<br />UNIONS.
<br />HIS FAULT OR NEGLIGENCE. HE SHALL ADEQUATELY PROTECT ADJACENT PROPERTY AS WELL.
<br />BAG -N -BOX
<br />1/2' @ 24' AFF
<br />LEVELEZE COATED CAST IRON BODY WITH ADJUSTABLE HOUSING, SATIN NIKALOY TOP AND
<br />---
<br />------
<br />A. MATERIALS -UNDERGROUND: TYPE "L" COPPER TUBE, SOFT TEMPER
<br />---
<br />B. EACH SUBCONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS FOR THE SAFETY OF
<br />INSIDE CAULK CONNECTION.
<br />THEIR EMPLOYEES ON THE WORK AND SHALL COMPLY WITH ALL PROVISIONS OF FEDERAL,
<br />WATER HEATER
<br />B. MATERIALS - ABOVEGROUND: TYPE "L" COPPER TUBE, HARD DRAWN.
<br />STATE AND LOCAL BUILDING CODES AND SAFETY LAWS TO PREVENT ACCIDENTS OR INJURY
<br />GAS WATER HEATER MODEL BTH-120 120 000 BTH, 60 GALLON, 154 GPH RECOVERY
<br />9
<br />TO PERSONS ON OR ADJACENT TO THE PREMISES WHERE THE WORK IS BEING PERFORMED.
<br />C. INSULATION: INSULATION FOR HOT, COLD AND HOT WATER RECIRC. PIPING SHALL BE 1/2" (1" ON 1ST
<br />EACH SUBCONTRACTOR SHALL MAINTAIN ALL INSURANCE REQUIRED TO PROTECT HIMSELF,
<br />8 FT. FROM HEATER) THICK ARMAFLEX UL LABELED OR FIBERGLASS 25 WITH ASJ/SSL FOIL/VINYL
<br />OWNER AND TENANT FOR THE DURATION OF THE WORK AGAINST PROPERTY DAMAGE AND
<br />JACKET OR EQUAL. INSULATE ALL PIPING AND FITTINGS.
<br />WATER FILTER SYSTEM
<br />PUBLIC LIABILITY.
<br />1/2' INDIRECT
<br />CHANGES IN THE WORK
<br />6.
<br />GAS PIPING
<br />A. UNDERGROUND GAS PIPING: ASTM A53, SCHEDULE 40 BLACK STEEL PIPE WITH LONG RADIUS STEEL
<br />THE TENANT, WITHOUT INVALIDATING THE CONTRACT, MAY ORDER EXTRA WORK OR MAKE CHANGES BY
<br />WELDING FITTINGS INCLUDING CATHODIC PROTECTION OR POLYETHYLENE AS APPROVED BY LOCAL GAS
<br />PREP TABLE W/SINK
<br />ALTERING, ADDING TO OR DEDUCTING FROM THE WORK, THE CONTRACT SUM BEING ADJUSTED
<br />COMPANY AND AUTHORITY HAVING JURISDICTION.
<br />ACCORDINGLY.
<br />'M' COPPER
<br />B. GAS PIPING ABOVE GROUND: ASTM A53, SCHEDULE 40 BLACK STEEL WITH 125 POUND BLACK
<br />COOPERATION
<br />IRON SCREWED FITTINGS. INSTALL MOISTURE TRAPS ON HVAC UNITS, WATER HEATER, AND
<br />ALL WORK UNDER THESE SPECIFICATIONS SHALL BE ACCOMPLISHED IN CONJUNCTION WITH OTHER ALL
<br />PREB TABLE FAUCET
<br />KITCHEN EQUIPMENT.
<br />1/2' @ 16'
<br />CONTRACTORS AND TRADES OF THIS PROJECT IN A MANNER WHICH WILL ALLOW EACH CONTRACTOR
<br />C. GAS PIPING COMPOUND AT JOINTS; IN COMPLIANCE WITH NFPA BULLETIN #54 AND LOCAL APPLICABLE
<br />AND TRADE ADEQUATE TIME AT THE PROPER STAGE OF CONSTRUCTION TO FULFILL HIS CONTRACTS.
<br />AFF
<br />CODES AND SUITABLE FOR NATURAL GAS SERVICE.
<br />REFERENCE SHALL BE MADE TO THE OWNER FOR INSTRUCTIONS SHOULD ANY QUESTIONS ARISE
<br />SELF CONTAINED ICE
<br />1/2' @ 66' AFF
<br />BETWEEN TRADES AS TO THE PLACING OF LINES, DUCTS, CONDUITS, FIXTURES, OR EQUIPMENT, OR
<br />7
<br />WASTE PIPING:
<br />MAKER (BDH)
<br />SHOULD IT APPEAR DESIRABLE TO REMOVE ANY GENERAL CONSTRUCTION WHICH WOULD AFFECT THE
<br />INSTALL HORIZONTAL DRAIN AND WASTE PIPES WITH 1/4 -/FT. SLOPE.
<br />APPEARANCE OR STRENGTH OF THE STRUCTURE.
<br />SUBSTITUTION OF MATERIALS
<br />MATERIALS:
<br />SOIL, WASTE AND VENT PIPING SHALL BE PVC SCH. 40 PIPING FOR SANITARY WASTE IN LIEU OF CAST
<br />ICE BIN
<br />MANUFACTURER'S NAMES ARE LISTED HEREIN TO ESTABLISH A STANDARD. THE PRODUCTS OF OTHER
<br />IRON WHERE ALLOWED BY AUTHORITY HAVING JURISDICTION. PIPING SHALL NOT BE EXPOSED IN
<br />MANUFACTURERS WILL BE ACCEPTABLE, IF IN THE OPINION OF THE OWNER OR OWNERS
<br />PLENUMS OR THE OPEN CEILING AREA IN THE DINING ROOM, CAST IRON - HUB TYPE WITH NEOPRENE
<br />REPRESENTATIVE THRU A SUBMITTAL PROCESS, THE SUBSTITUTE MATERIAL IS OF A QUALITY AS GOOD
<br />JOINTS - WITH STAINLESS STEEL CONNECTORS WHEN PVC IS NOT ALLOWED PER LOCAL CODE.
<br />OR BETTER THAN THE MATERIAL SPECIFIED, AND WILL SERVE WITH EQUAL EFFICIENCY AND
<br />ALTERNATE BID ITEM CAST IRON NO HUB AND FITTINGS, WRAPPED WITH 3 MIL. PLASTIC, OR A.B.S.
<br />DEPENDABILITY, THE PURPOSE FOR WHICH THE ITEMS SPECIFIED WERE INTENDED.
<br />3 COMPARTMENT SINK
<br />PIPING, BELOW SLAB OR GRADE ONLY, IF APPROVED BY LOCAL ADMINISTRATIVE AUTHORITY. INDIRECT
<br />1-1/2' TYPE
<br />WASTE PIPING TO BE IN COOLER/FREEZER, 3 COMPARTMENT SINK AND PREP SINK TO BE COPPER
<br />SHOP DRAWINGS
<br />CATALOG DATA ON ALL MAJOR ITEMS OF EQUIPMENT AND SYSTEMS, AND SUCH
<br />LINES FOR INDIRECT CONNECTION TO FLOOR SINK, CONDENSATE PIPING TO BE PVC.
<br />SHOP DRAWINGS AND
<br />OTHER ILLUSTRATIVE MATERIAL AS MAY BE CONSIDERED NECESSARY BY THE TENANT, SHALL BE
<br />SUBMITTED BY THIS CONTRACTOR IN ADEQUATE TIME TO PREVENT DELAY AND CHANGES DURING
<br />8.
<br />PIPE SLEEVES/ESCUTCHEONS:
<br />PROVIDE CHROME -PLATED ESCUTCHEONS ON ALL PIPES PASSING THROUGH WALLS, FLOORS, OR CEILINGS OF
<br />PRE -RINSE UNIT WITH
<br />CONSTRUCTION.
<br />FINISHED ROOMS. ESCUTCHEONS TO BE BEATON & CADWELL, #10, 40, 6A OR EQUIVALENT WITH
<br />17
<br />FAUCET
<br />SET -SCREWS. PROVIDE ESCUTCHEONS ON ALL WASTE LINES FROM PLUMBING FIXTURES, WHETHER THROUGH
<br />DRAWINGS AND SPECIFICATIONS
<br />THE DRAWINGS SHOW DIAGRAMMATICALLY THE LOCATIONS OF THE VARIOUS LINES, DUCTS,
<br />WALLS, FLOORS, AND WHETHER CONCEALED BEHIND COUNTERS OR EXPOSED. PIPE SLEEVES SHALL BE
<br />FRYER(3)
<br />A.
<br />CONDUITS, FIXTURES, AND EQUIPMENT AND THE METHOD OF CONNECTING AND CONTROLLING
<br />PROVIDED WHEN PIPES PENETRATE FOUNDATION AND SHALL BE 1" LARGER THAN PIPE, SEAL SLEEVE
<br />240 MBH
<br />THEM. IT IS NOT INTENDED TO SHOW EVERY CONNECTION IN DETAIL AND ALL FITTINGS
<br />W/CAULKING.
<br />REQUIRED FOR A COMPLETE SYSTEM.
<br />CHAR -ROCK BROILER
<br />B. SHOULD ANY CHANGES BE DEEMED NECESSARY BY THE CONTRACTOR IN ITEMS SHOWN ON
<br />9.
<br />PLUMBING FIXTURES:
<br />FURNISH AND INSTALL PLUMBING FIXTURES AS SHOWN ON DRAWINGS WITH ALL ACCESSORIES AND TRIM AS
<br />105 MBH
<br />CONTRACT DRAWINGS, THE SHOP DRAWINGS, DESCRIPTIONS, AND THE REASON FOR THE
<br />LISTED. ALL FIXTURES SHALL BE PROTECTED THROUGH THE COURSE OF THE CONSTRUCTION. ANY FIXTURE
<br />PROPOSED CHANGES SHALL BE SUBMITTED TO THE OWNER FOR APPROVAL.
<br />DAMAGED SHALL BE REPLACED WITHOUT ADDITIONAL EXPENSE TO THE OWNER.
<br />GRIDDLE
<br />RESPONSIBILITY
<br />THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE SATISFACTORY AND COMPLETE
<br />10.
<br />CONNECTION TO OTHER FIXTURES:
<br />CONNECT BUILDING SERVICE PIPING, INCLUDING BUT NOT LIMITED TO WATER, DRAIN, AND GAS PIPES TO
<br />A.
<br />EXECUTION OF ALL WORK INCLUDED IN HIS CONTRACT. HE SHALL PRODUCE COMPLETE
<br />FOOD SERVICE EQUIPMENT AS INDICATED IN EQUIPMENT SPECIFICATIONS. PROVIDE BACKFLOW PROTECTION ON
<br />FINISHED OPERATING SYSTEMS AND PROVIDE ALL INCIDENTAL ITEMS REQUIRED AS PART OF
<br />ICE MACHINES AND BEVERAGE EQUIPMENT SUPPLY CONNECTIONS.
<br />GRIDDLE
<br />HIS WORK, REGARDLESS OF WHETHER SUCH ITEM IS PARTICULARLY SPECIFIED OR INDICATED.
<br />271
<br />11.
<br />TESTS:
<br />A. DRAINAGE AND VENT PIPING - DRAINAGE AND VENT PIPING SHALL BE TESTED BEFORE THE PLUMBING
<br />GENERAL PROVISIONS
<br />1. SCOPE: PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT IN ACCORDANCE WITH THESE
<br />FIXTURES ARE INSTALLED BY CAPPING THE OPENINGS AND FILLING THE ENTIRE SYSTEM WITH WATER
<br />S.S. HAND SINK
<br />SPECIFICATIONS AND THE ACCOMPANYING DRAWINGS TO PROVIDE A COMPLETE AND PROPERLY
<br />AND ALLOWING IT TO STAND THUS FILLED NOT LESS THAN ONE (1) HOUR. INSPECT WATER LEVEL TO
<br />OPERATING PLUMBING SYSTEM FOR THE BUILDING.
<br />DETERMINE IF PIPING IS TIGHT.
<br />PIPING LINES SHALL BE TESTED BEFORE THE PLUMBING FIXTURES
<br />OBTAIN WATER, SEWER, GAS TAPS, AND ANY OTHER REQUIRED UTILITIES AND EXTEND SERVICE
<br />B. WATER PIPING - THE WATER SUPPLY
<br />ARE CONNECTED BY FILLING THE ENTIRE SYSTEM WITH POTABLE WATER AND APPLYING HYDROSTATIC
<br />HAND SINK FAUCET
<br />FROM SAME TO BUILDING AS SHOWN ON DRAWINGS. VISIT THE SITE FOR UNDERSTANDING OF
<br />1/2' @ 16'
<br />PRESSURE OF 100 PSI AND ALLOWING TO STAND FOR NOT LESS THAN FOUR (4) HOURS AT THIS
<br />THE WORK TO BE DONE BEFORE SUBMITTING BID.
<br />PRESSURE TO PROVE PLUMBING INTEGRITY.
<br />AFF
<br />C. GAS PIPING - IN LIEU OF LOCAL REQUIREMENTS, GAS PIPING SHALL BE FILLED WITH COMPRESSED AIR
<br />WALL MTD HAND SINK
<br />COORDINATE THIS WORK WITH THE WORK OF THE OTHER TRADES ON THE PROJECT. ALL
<br />TO 150 PSI AND HELD FOR A PERIOD OF FOUR (4) HOURS. EACH JOINT SHALL BE CHECKED BY
<br />PLUMBING IS TO BE ROUGHED IN WHILE THE BUILDING IS BEING CONSTRUCTED AT SUCH TIMES
<br />LIQUID SOAP OR SPECIAL LIQUID CHEMICAL FOR LEAKS. NOTE: REMOVE ALL GAS VALVES AND PROTECT
<br />AS NOT TO DELAY THE GENERAL CONTRACTOR ON THE BUILDING.
<br />FROM DAMAGE BEFORE TESTING SYSTEM.
<br />LOW LEAD FAUCET
<br />2. GENERAL REQUIREMENTS: COMPLY WITH ALL FEDERAL, STATE, AND LOCAL REQUIREMENTS, CODES,
<br />12.
<br />DISINFECTION OF POTABLE WATER SYSTEM:
<br />RULES, AND ORDINANCES GOVERNING WORK OF THIS CHARACTER. PAY FOR AND OBTAIN
<br />UPON COMPLETION OF INSTALLATION DISINFECT THE WATER SYSTEM BY FILLING IT WITH SOLUTION CONTAINING
<br />AFF
<br />NECESSARY CONSTRUCTION PERMITS AND CERTIFICATES OF INSPECTION.
<br />50 PARTS PER MILLION OF CHLORINE AND ALLOW IT TO STAND FOR NOT LESS THAN SIX (6) HOURS
<br />ICE TEA
<br />THE LOCATION OF THE PIPING RUNS ARE APPROXIMATE AND THE CONTRACTOR
<br />BEFORE FLUSHING THOROUGHLY AND RETURNING TO SERVICE. FURNISH CLEAN WATER SAMPLES TO THE
<br />DISINFECTED. THIS PROCEDURE TO BE IN
<br />A. DRAWINGS:
<br />MAKE ANY NECESSARY CHANGES IN THE PIPING RUNS, ETC., AT NO ADDITIONAL COST
<br />LOCAL AUTHORITY FOR TESTING AFTER THE LINES HAVE BEEN
<br />MUST
<br />TO THE OWNER. OUTLET LOCATIONS ARE CRITICAL AND MUST BE LOCATED EXACTLY
<br />ACCORDANCE WITH STATE PLUMBING CODE.
<br />SODA DISPENSER
<br />ACCORDING TO THE PLUMBING PLAN. COORDINATE THIS WORK WITH THE INSTALLERS OF
<br />13.
<br />CLEANUP:
<br />EQUIPMENT FURNISHED AND INSTALLED BY OTHERS. REFER TO THE OTHER DRAWINGS FOR
<br />CLEAN ALL PLUMBING FIXTURES AND EQUIPMENT THOROUGHLY BEFORE FINAL INSPECTION, LEAVING ALL
<br />DETAILS OF THE BUILDING CONSTRUCTION AND THE OTHER MECHANICAL, ELECTRICAL, AND
<br />READY FOR USE.
<br />EQUIPMENT FEATURES.
<br />DRAIN
<br />B. COORDINATION AND WORKMANSHIP: SCHEDULE THIS WORK SO THAT IT WILL BE PROPERLY
<br />14.
<br />GUARANTEE:
<br />MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED FOR ONE (1) YEAR FROM DATE OF FINAL
<br />COORDINATED WITH ALL OTHER TRADES. WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE
<br />ACCEPTANCE. DEFECTIVE WORK AND ALL DAMAGES CAUSED THEREBY WHICH MAY OCCUR DURING THE TERM
<br />BEST PRACTICE FOR THE CLASS OF WORK INVOLVED. WORKMANSHIP SHALL ALLOW THE
<br />THE PUBLIC
<br />OF THE AFOREMENTIONED GUARANTEE WILL BE REPAIRED AND/OR REPLACED AT NO EXPENSE TO THE
<br />APPLIANCE TO OPERATE AS INTENDED AND BE INSTALLED TO BEST PROTECT
<br />AND OPERATORS FROM INJURY OR DAMAGE, AND TO PRESENT A NEAT, PLEASING, AND
<br />OWNER.
<br />CARBONATOR
<br />ORDERLY APPEARANCE.
<br />1' INDIRECT
<br />46,4
<br />15.
<br />OWNER'S MANUAL:
<br />DRAIN
<br />PROVIDE THE OWNER, AT THE COMPLETION OF THIS CONTRACT, WITH AN "OWNER'S MANUAL" SO LABELED.
<br />HOSE BIB
<br />MATERIALS AND PERFORMANCE
<br />3/4'
<br />THE MANUAL SHALL CONSIST OF A THREE-RING LOOSE-LEAF BINDER CONTAINING ALL PRINTED MATTER SUCH
<br />1. MATERIALS:
<br />SHALL BE NEW AND OF THE QUALITY INDICATED BY THE SPECIFIED BRAND NAMES.
<br />HAND SINK
<br />AS: GUARANTEE CARDS, CLEANING INSTRUCTIONS, NOTICES TO OWNER, OPERATING MANUALS, AND
<br />ALL MATERIALS
<br />SUBSTITUTIONS OF MATERIAL OF EQUAL QUALITY BY OTHER FIRST-LINE MANUFACTURERS MAY BE
<br />MAINTENANCE INSTRUCTIONS THAT MAY BE CONTAINED IN THE SHIPPING CARTONS OR EQUIPMENT HOUSINGS.
<br />ACCEPTABLE PROVIDED A LIST OF SUCH SUBSTITUTIONS IS APPROVED IN WRITING. A
<br />SUBSTITUTIONS LIST SHALL BE SUBMITTED IN TRIPLICATE WITHIN FIVE (5) DAYS AFTER THE
<br />HAND SINK FAUCET
<br />1/2' @ 12' AFF
<br />1/2' @ 12'
<br />CONTRACT IS LET.
<br />81,1
<br />W
<br />HHEATER 1
<br />ER
<br />RECIRCULATION I 1
<br />PUMP
<br />ADA COMPLIANT, VITREOUS CHINA, LOW CONSUMPTION (.0125 GPF), SIPHON JET
<br />- 3/4" --- --- --- ACTION, 3/4" INLET SPUD, 2" OUTLET. SLOAN ROYAL FLUSHOMETER MODEL 186-0.125
<br />HIGH EFFICIENCY MANUAL FLUSH VALVE, .125 GPF
<br />WITH BRONZE STRAINER, DOUBLE DRAINAGE FLANGE, WEEP HOLES AND TRAP PRIMER
<br />GENERAL_-_
<br />J.R. SMITH
<br />4420 SERIES
<br />GENERAL
<br />CONTRACTOR
<br />4
<br />2"
<br />WALL
<br />CLEANOUT
<br />14
<br />J.R. SMITH
<br />4020 SERIES
<br />GENERAL
<br />CONTRACTOR
<br />4
<br />A. 0. SMITH
<br />FLOOR
<br />CLEANOUT
<br />3
<br />W
<br />HHEATER 1
<br />ER
<br />RECIRCULATION I 1
<br />PUMP
<br />ADA COMPLIANT, VITREOUS CHINA, LOW CONSUMPTION (.0125 GPF), SIPHON JET
<br />- 3/4" --- --- --- ACTION, 3/4" INLET SPUD, 2" OUTLET. SLOAN ROYAL FLUSHOMETER MODEL 186-0.125
<br />HIGH EFFICIENCY MANUAL FLUSH VALVE, .125 GPF
<br />WITH BRONZE STRAINER, DOUBLE DRAINAGE FLANGE, WEEP HOLES AND TRAP PRIMER
<br />CONTRACTOR NOTE:
<br />WATER HEATER, EXPANSION TANK AND DOMESTIC HOT WATER
<br />RECIRCULATION PUMP TO BE FURNISHED BY OWNER AND
<br />INSTALLED BY THE CONTRACTOR.
<br />CONTRACTOR TO FURNISH AND INSTALL ALL PIPING, FITTINGS
<br />AND VALVING REQUIRED FOR A COMPLETE AND WORKING
<br />SYSTEM.
<br />THE CHEMICAL INJECTION SYSTEMS ARE SUPPLIED BY
<br />BUTLER CHEMICAL AND THEY UTILIZE ENMESHED AIR GAPS
<br />AS A MEANS OF BACKFLOW PREVENTION. IF PRESSURE
<br />REQUIRES, BUTLER CHEMICAL WILL SUPPLY A SEPARATE
<br />VALVE TO ADJUST THE PRESSURE AS REQUIRED.
<br />EQUIPMENT & FIXTURE SCHEDULE - PLUMBING
<br />GENERAL_-_
<br />---
<br />---
<br />CW
<br />______
<br />CAST IRON BODY WITH ACID RESISTING INTERIOR WITH STRAINER AND HALF GRATE, HOLD
<br />3„
<br />---- -
<br />---
<br />90 DEG. TEMP RISE, INSTALL IN DRIP PAN, PIPE T&P FULL SIZE TO NEAREST DRAIN.
<br />A. 0. SMITH
<br />_
<br />CENTER LINE OF FLOOR SINK 14" FROM WALL.
<br />2 1
<br />COOLER
<br />•Llllll� v
<br />rrvs�a
<br />DRAIN
<br />�oMm�
<br />MODEL #PR50OAUS, ALL BRONZE TRAP PRIMER WITH REMOVABLE OPERATING PARTS,
<br />---
<br />------
<br />1/2"
<br />---
<br />---
<br />---
<br />INTEGRAL
<br />DRAIN
<br />GRUNDFOS MODEL UP -15, SET PUMP TO PROVIDE A MAXIMUM OF 2 GPM THRU THE
<br />JANITORS SINK
<br />VACUUM BREAKER GASKETED ACCESS COVER AND CHROME PLATED.
<br />---
<br />---
<br />---
<br />-----
<br />1/2"
<br />---
<br />THERMOSTATIC WATER MIXING VALVE MODEL LFL495, INTEGRAL COMBINATION CHECK
<br />---
<br />SYSTEM AT 10 FT. HEAD PLUS PIPING LOSSES, 115V, .022 AMPS, 25 WATTS, 1/25 HP.,
<br />1/2"
<br />1/2"
<br />1/2"
<br />1/2' @ 16'
<br />STOPS WITH STRAINERS, TEMPERATURE RANGE: 80 TO 140 DEG., FLOW CAPACITY OF A
<br />---
<br />-_--
<br />IN
<br />IN
<br />OUT
<br />---
<br />MINIMUM OF .5 GPM TO MAX 12 GPM, BRONZE BODY, INTEGRAL FILTER WASH, CHECK
<br />CHEMICAL DISPENSER
<br />VALVES, ADJUSTMENT CAP WITH LOCKING FEATURE, 0.5 GPM MINIMUM FLOW.
<br />CAST IRON CAULKING FERRULE WITH BRASS RAISED HEAD PLUS POLISHED NIKALOY OR
<br />2"
<br />------
<br />---
<br />---
<br />---
<br />---
<br />STAINLESS STEEL COVER PLATE. SECURE WITH SCEW SPIGOT CONNECTION.
<br />BAG -N -BOX
<br />1/2' @ 24' AFF
<br />LEVELEZE COATED CAST IRON BODY WITH ADJUSTABLE HOUSING, SATIN NIKALOY TOP AND
<br />---
<br />------
<br />---
<br />---
<br />---
<br />INSIDE CAULK CONNECTION.
<br />WATER HEATER
<br />SEE WATER
<br />GAS WATER HEATER MODEL BTH-120 120 000 BTH, 60 GALLON, 154 GPH RECOVERY
<br />CONTRACTOR NOTE:
<br />WATER HEATER, EXPANSION TANK AND DOMESTIC HOT WATER
<br />RECIRCULATION PUMP TO BE FURNISHED BY OWNER AND
<br />INSTALLED BY THE CONTRACTOR.
<br />CONTRACTOR TO FURNISH AND INSTALL ALL PIPING, FITTINGS
<br />AND VALVING REQUIRED FOR A COMPLETE AND WORKING
<br />SYSTEM.
<br />THE CHEMICAL INJECTION SYSTEMS ARE SUPPLIED BY
<br />BUTLER CHEMICAL AND THEY UTILIZE ENMESHED AIR GAPS
<br />AS A MEANS OF BACKFLOW PREVENTION. IF PRESSURE
<br />REQUIRES, BUTLER CHEMICAL WILL SUPPLY A SEPARATE
<br />VALVE TO ADJUST THE PRESSURE AS REQUIRED.
<br />EQUIPMENT & FIXTURE SCHEDULE - PLUMBING
<br />GENERAL_-_
<br />---
<br />---
<br />CW
<br />______
<br />1 1/2"
<br />1 1/2"
<br />---
<br />---
<br />90 DEG. TEMP RISE, INSTALL IN DRIP PAN, PIPE T&P FULL SIZE TO NEAREST DRAIN.
<br />A. 0. SMITH
<br />CONTRACTOR
<br />Lo
<br />2 1
<br />COOLER
<br />•Llllll� v
<br />rrvs�a
<br />DRAIN
<br />�oMm�
<br />N
<br />EVAPORATOR
<br />V INDIRECT
<br />Q
<br />2'4
<br />COIL -FREEZER
<br />DRAIN
<br />GRUNDFOS MODEL UP -15, SET PUMP TO PROVIDE A MAXIMUM OF 2 GPM THRU THE
<br />JANITORS SINK
<br />GENERAL
<br />---
<br />---
<br />---
<br />-----
<br />1/2"
<br />---
<br />---
<br />---
<br />SYSTEM AT 10 FT. HEAD PLUS PIPING LOSSES, 115V, .022 AMPS, 25 WATTS, 1/25 HP.,
<br />GRUNDFOS
<br />CONTRACTOR
<br />1/2' @ 42' AFF
<br />1/2' @ 16'
<br />3'
<br />6 2
<br />FAUCET W/VAC BRKR
<br />AFF
<br />SEE KEYED NOTE 24 ON SHEET E210 FOR AUTOMATIC CONTROL OF CIRCULATION PUMP
<br />CONTRACTOR NOTE:
<br />WATER HEATER, EXPANSION TANK AND DOMESTIC HOT WATER
<br />RECIRCULATION PUMP TO BE FURNISHED BY OWNER AND
<br />INSTALLED BY THE CONTRACTOR.
<br />CONTRACTOR TO FURNISH AND INSTALL ALL PIPING, FITTINGS
<br />AND VALVING REQUIRED FOR A COMPLETE AND WORKING
<br />SYSTEM.
<br />THE CHEMICAL INJECTION SYSTEMS ARE SUPPLIED BY
<br />BUTLER CHEMICAL AND THEY UTILIZE ENMESHED AIR GAPS
<br />AS A MEANS OF BACKFLOW PREVENTION. IF PRESSURE
<br />REQUIRES, BUTLER CHEMICAL WILL SUPPLY A SEPARATE
<br />VALVE TO ADJUST THE PRESSURE AS REQUIRED.
<br />EQUIPMENT & FIXTURE SCHEDULE - PLUMBING
<br />MARK
<br />DESCRIPTION
<br />CW
<br />HW
<br />WASTE
<br />GAS
<br />m V
<br />EVAPORATOR COIL -
<br />un
<br />C
<br />1' INDIRECT
<br />Lo
<br />2 1
<br />COOLER
<br />•Llllll� v
<br />rrvs�a
<br />DRAIN
<br />�oMm�
<br />N
<br />EVAPORATOR
<br />V INDIRECT
<br />Q
<br />2'4
<br />COIL -FREEZER
<br />DRAIN
<br />O
<br />JANITORS SINK
<br />=
<br />U)
<br />M
<br />Q
<br />6
<br />N
<br />IT-
<br />JANITORS SINK -
<br />1/2' @ 42' AFF
<br />1/2' @ 16'
<br />3'
<br />6 2
<br />FAUCET W/VAC BRKR
<br />AFF
<br />CHEMICAL DISPENSER
<br />6.4
<br />HOSE BIB FOR CHEMICAL
<br />48' AFF
<br />6.5
<br />DISPENSER
<br />BAG -N -BOX
<br />1/2' @ 24' AFF
<br />7
<br />WATER HEATER
<br />SEE WATER
<br />9
<br />HEATER
<br />SCHEDULE
<br />WATER FILTER SYSTEM
<br />3/4' @ 96' AFF
<br />1/2' INDIRECT
<br />10
<br />DRAIN
<br />PREP TABLE W/SINK
<br />1-1/2' TYPE
<br />12.1
<br />'M' COPPER
<br />TO FS
<br />PREB TABLE FAUCET
<br />1/2' @ 16' AFF
<br />1/2' @ 16'
<br />12
<br />AFF
<br />SELF CONTAINED ICE
<br />1/2' @ 66' AFF
<br />3/4'
<br />14
<br />MAKER (BDH)
<br />INDIRECT
<br />DRAIN
<br />ICE BIN
<br />3/4'
<br />15
<br />INDIRECT
<br />DRAIN
<br />3 COMPARTMENT SINK
<br />1-1/2' TYPE
<br />16
<br />'M' COPPER
<br />TO FS
<br />PRE -RINSE UNIT WITH
<br />1/2' @ 16' AFF
<br />17
<br />FAUCET
<br />FRYER(3)
<br />240 MBH
<br />24
<br />CHAR -ROCK BROILER
<br />105 MBH
<br />25
<br />GRIDDLE
<br />27
<br />GRIDDLE
<br />271
<br />S.S. HAND SINK
<br />1-1/2' @ 14'
<br />37
<br />AFF
<br />HAND SINK FAUCET
<br />1/2' @ 16' AFF
<br />1/2' @ 16'
<br />37.1
<br />AFF
<br />WALL MTD HAND SINK
<br />1-1/2' @ 16'
<br />38
<br />AFF
<br />LOW LEAD FAUCET
<br />1/2' @ 16' AFF
<br />1/2' @ 16'
<br />38,1
<br />AFF
<br />ICE TEA
<br />1/2' FCW @ 24'
<br />45
<br />AFF
<br />SODA DISPENSER
<br />1/2' FCW @ 24'
<br />SEPERATE 1'
<br />46
<br />AFF
<br />INDIRECT
<br />DRAIN
<br />ICE MACHINE (FOH)
<br />1/2' FCW @ 60'
<br />SEPERATE 1'
<br />46.1
<br />AFF
<br />INDIRECT
<br />DRAIN
<br />CARBONATOR
<br />1/2' FCW @ 60'
<br />1' INDIRECT
<br />46,4
<br />AFF
<br />DRAIN
<br />78
<br />HOSE BIB
<br />3/4'
<br />HAND SINK
<br />1 1/AFF 8'
<br />81
<br />HAND SINK FAUCET
<br />1/2' @ 12' AFF
<br />1/2' @ 12'
<br />81,1
<br />AFF
<br />GENERAL NOTES
<br />1. ALL WORK SHALL CONFORM TO THE 2012 INTERNATIONAL PLUMBING CODE AND AMENDMENTS
<br />ADOPTED BY THE CITY OF TUSCAN. INCOMING WATER, SEWER, AND GREASE WASTES ARE EXISTING
<br />AND NEW OCCUPANT FIXTURE LOADS SHALL NOT EXCEED THE EXISTING DEMAND LOADS.
<br />2. VERIFY SIZE, DEPTH, LOCATION AND ADEQUACY OF ALL UTILITIES, INCLUDING METER LOCATIONS AND
<br />SEWER INVERTS,
<br />3. BEFORE STARTING WORK ALL PIPING IN FINISHED AREAS SHALL BE CONCEALED WHERE POSSIBLE,AND
<br />EXPOSED PIPING SHALL BE RUN AS HIGH AS POSSIBLE AND TIGHT TO WALLS.
<br />4. ALL LINES TO BE AWAY FROM BEARING FOOTINGS, OR AS DIRECTED BY STRUCTURAL ENGINEER.
<br />5. ALL APPLIANCE AND PLUMBING VENTS SHALL BE AT LEAST TEN (10) FEET IN HORIZONTAL DIRECTION
<br />OR THREE (3) FEET ABOVE THE OUTSIDE AIR INTAKES FOR HVAC UNITS.
<br />6. SEWER TO BE RUN ® 1/4" SLOPE. UPC LARGER MAY BE LAID AT A SLOPE OF NOT LESS THAN 1%
<br />WHEN FIRST APPROVED BY THE BUILDING DEPARTMENT.
<br />7. ALL REQUIRED CLEANOUTS SHALL BE INSTALLED AS PER 2012 INTERNATIONAL PLUMBING CODE AND
<br />AMENDMENTS ADOPTED BY THE CITY OF TUSCAN.
<br />Consulfanl
<br />CU-wm
<br />F.
<br />V )
<br />8
<br />Q
<br />M
<br />m V
<br />un
<br />C
<br />v
<br />V`
<br />v
<br />Lo
<br />C
<br />•Llllll� v
<br />rrvs�a
<br />�oMm�
<br />N
<br />m yFLLv
<br />w
<br />Q
<br />M
<br />LIJ
<br />Lo
<br />M
<br />Lid
<br />U
<br />N
<br />W
<br />Q
<br />Uj
<br />OW
<br />O
<br />W
<br />=
<br />U)
<br />M
<br />Q
<br />N
<br />IT-
<br />U) W
<br />U
<br />LU
<br />0-0
<br />U) LU
<br />V =
<br />Z_ U
<br />Cm U)
<br />G n
<br />Cl -
<br />Project Number: 17-536
<br />Plan Check Number:
<br />10112/17 A ISSUE FOR PERMIT
<br />P100
<br />
|