Laserfiche WebLink
REFER TO <br />CIVIL DRAWINGS <br />FOR CONTINUATION <br />28 <br />------------------- — — <br />I <br />0 <br />I I <br />I I <br />I I <br />I I <br />I <br />17 O 17 <br />GIC <br />GREASE <br />INTERCEPTOR <br />CALCULATIONS <br />INTERCEPTOR VOLUME <br />PLUMBING FIXTURE <br />DRAINAGE FIXTURE <br />UNITS <br />NUMBER OF <br />FIXTURES <br />TOTAL DRAINAGE <br />FIXTURE UNITS <br />3—COMP SINK <br />4 <br />1 <br />4 <br />PREP—SINK <br />2 <br />2 <br />4 <br />3" FLOOR DRAINS <br />2 <br />4 <br />8 <br />3" FLOOR SINKS 1 <br />2 <br />3 <br />6 <br />MOP SINK 1 <br />3 <br />1 <br />3 <br />TOTAL DRAINAGE FIXTURE UNITS= <br />LAV. <br />LAVATORY <br />25 <br />SIZE OF GREASE INTERCEPTOR= <br />UR. <br />URINAL <br />1000 GALLON <br />GRAVITY <br />GREASE INTERCEPTOR SIZING <br />DFU'S <br />INTERCEPTOR VOLUME <br />8 <br />500 GALLONS <br />21 <br />750 GALLONS <br />35 <br />1,000 GALLONS <br />F777;o- <br />1,250 GALLONS <br />PREP -SINK <br />PREP—SINK <br />N OTE. <br />1. REFER TO RISER DIAGRAM ON SHEET P400 FOR PIPE SIZES. <br />2. REFER TO PLUMBING FIXTURE SCHEDULE ON SHEET P100 FOR KEYED NOTES (D AND 0. <br />LINE TYPES <br />SS SANITARY PIPING <br />GW GREASE WASTE PIPING <br />CONDENSATE PIPING <br />VENT PIPING <br />23 (® 4 FS o� oo WC 15 <br />WC -1 WC -1 <br />1 <br />OO -�g y — O 10 <br />o <br />20 ° GW 020 WC -1 <br />/ FS 14 FCO FI <br />25 12 <br />00 00 25 12 FD o > 04 <br />o � 14 FSAIR <br />_ <br />_ 1 1 <br />LAV <br />0 0 mill 1 ~ LAV <br />C <br />19 <br />�* 25 12 FD <br />FCO \ ti\ 2 25 FD n - 14 15 14 6 1 6 15 <br />FCO FS 3 -COMP o 0 <br />- ~ 1 38 HS 27 12 25 FD <br />0CD O CD <br />I <br />1 II III 1 �\ of a o <br />\ D o t, <br />�_ \~ CID <br />23 WCO <br />14 FS 14 <br />< FS 5 6 <br />h 16 22 10 <br />CD <br />26 CD 8 <br />9 <br />SODA DISP <br />— FCO 27 13 <br />/71010 7 <br />CARBONATOR <br />S -2"I <br />i <br />—O <br />FCO <br />S <br />PF <br />n <br />on <br />PLUMBING <br />SYMBOLS <br />S.S. <br />SANITARY SEWER LINE <br />T. P. <br />TRAP PRIMER <br />GW. <br />GREASE WASTE LINE <br />T.M.V. <br />THERMOSTATIC MIXING VALVE <br />V <br />VENT LINE <br />T.P.R.V. <br />TEMP. PRESSURE RELIEF VALVE <br />GAS LINE <br />*P.O.C. <br />POINT OF CONNECTION <br />�og�o <br />COLD WATER LINE <br />B.F.P. <br />BACK FLOW PREVENTER <br />HOT WATER LINE <br />G.I./T. <br />GREASE INTERCEPTOR/TRAP <br />N <br />TEMPERED WATER LINE <br />LAV. <br />LAVATORY <br />LLJ <br />FILTERED WATER LINE <br />UR. <br />URINAL <br />SHUT-OFF VALVE <br />W.C. <br />WATER CLOSET <br />M <br />r <br />BACKFLOW PREVENTER <br />G. R. <br />GLASS RACK <br />V.T.R. <br />VENT THRU ROOF <br />A.F.F. <br />ABOVE FINISHED FLOOR <br />C. 1. <br />CAST IRON <br />B.F.F. <br />BELOW FINISHED FLOOR <br />C.W. <br />COLD WATER <br />❑M <br />WATER METER <br />H.W. <br />HOT WATER <br />W. H. <br />WATER HEATER <br />T.W. <br />TEMPERED WATER <br />E.C.O. <br />EXTERIOR CLEAN-OU4 <br />F.W. <br />FILTER WATER <br />F.C.O. <br />FLOOR CLEAN-OUT <br />F.S. <br />FLOOR SINK <br />W.C.O. <br />WALL CLEAN-OUT <br />F. D. <br />FLOOR DRAIN <br />M.S. <br />MOP SINK <br />H. D. <br />HUB DRAIN <br />S.S. <br />SCULLERY SINK <br />F.F.D. <br />FUNNEL FLOOR DRAIN <br />F.E.S. <br />FABRICATED ECONOMYSINK <br />K.F.D. <br />KITCHEN FLOOR DRAIN <br />H. S. <br />HAND SINK <br />R.F.D. <br />RESTROOM FLOOR DRAIN <br />U.B.S. <br />UNDER BAR SINK <br />E.M. <br />ELECTRICAL METER <br />U. B. H. S. <br />UNDER BAR HAND SINK <br />G. M. <br />GAS METER <br />I.C.C. <br />ICE CREAM CABINET <br />N OTE. <br />1. REFER TO RISER DIAGRAM ON SHEET P400 FOR PIPE SIZES. <br />2. REFER TO PLUMBING FIXTURE SCHEDULE ON SHEET P100 FOR KEYED NOTES (D AND 0. <br />LINE TYPES <br />SS SANITARY PIPING <br />GW GREASE WASTE PIPING <br />CONDENSATE PIPING <br />VENT PIPING <br />23 (® 4 FS o� oo WC 15 <br />WC -1 WC -1 <br />1 <br />OO -�g y — O 10 <br />o <br />20 ° GW 020 WC -1 <br />/ FS 14 FCO FI <br />25 12 <br />00 00 25 12 FD o > 04 <br />o � 14 FSAIR <br />_ <br />_ 1 1 <br />LAV <br />0 0 mill 1 ~ LAV <br />C <br />19 <br />�* 25 12 FD <br />FCO \ ti\ 2 25 FD n - 14 15 14 6 1 6 15 <br />FCO FS 3 -COMP o 0 <br />- ~ 1 38 HS 27 12 25 FD <br />0CD O CD <br />I <br />1 II III 1 �\ of a o <br />\ D o t, <br />�_ \~ CID <br />23 WCO <br />14 FS 14 <br />< FS 5 6 <br />h 16 22 10 <br />CD <br />26 CD 8 <br />9 <br />SODA DISP <br />— FCO 27 13 <br />/71010 7 <br />CARBONATOR <br />S -2"I <br />i <br />—O <br />FCO <br />S <br />PF <br />n <br />on <br />SANITARY + GREASE WASTE PLAN <br />SCALE: <br />SANITARY/GREASE WASTE PLAN KEYED NOTES O <br />O1 NEW HAND SINK. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />O NEW PREP SINK. ROUTE 1 1/2" COPPER WASTE PIPE WITH INDIRECT CONNECTION TO FLOOR <br />SINK. PROVIDE AIR GAP PER CODE. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />O3 NEW ICE MAKER WITH BIN. ROUTE INDIRECT WASTE TO FLOOR SINK. PROVIDE AIR GAP PER CODE. <br />REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />O4 NEW URINAL. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />O NEW MOP SINK. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />O6 NEW 3 COMP SINK. ROUTE 1 1/2" COPPER WASTE PIPE WITH INDIRECT CONNECTION TO FLOOR <br />SINK. PROVIDE AIR GAP PER CODE. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />O NEW CARBONATOR/SODA RACK. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />OS NEW SODA MACHINE W/ICE MAKER ABOVE. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR <br />INFORMATION. <br />O NEW ICE TEA BREWER. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. FIELD <br />VERIFY. <br />10 NEW WATER CLOSET. REFER TO PLUMBING FIXTURE SCHEDULE FOR INFORMATION. <br />11 NEW LAVATORY. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />12 NEW FLOOR DRAIN. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />13 1-1/4" CONDENSATE DRAIN DOWN IN WALL AND TERMINATE INTO MOP BASIN WITH CODE <br />APPROVED AIR GAP. <br />14 NEW FLOOR SINK. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />15 NEW WALL CLEAN-OUT. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />16 SODA LINES FROM SODA SYSTEM TO SODA MACHINE. <br />17 4" GREASE WASTE TO JENSEN PRECAST JP1000 1000 GALLON EXTERIOR BELOW GRADE GREASE <br />INTERCEPTOR. PROVIDE PARKS SWP-244 SAMPLE WELL. SEE PROJECT CIVIL DRAWINGS FOR <br />ADDITIONAL DETAILS AND LOCATION. <br />18 POINT OF CONNECT TO EXISTING 4" SANITARY SEWER PIPING. VERIFY EXACT LOCATION, SIZE <br />DEPTH, DIRECTION OF FLOW AND PIPE MATERIAL OUT IN FIELD. <br />19 PROVIDED 3" VENT THRU ROOF. ENSURE VENT THRU ROOF IS AT LEAST 10'-0" AWAY FROM ALL <br />OUTSIDE AIR INTAKES. FIELD VERIFY LOCATION. <br />20 ROUTE CONDENSATE DRAIN FROM COOLER AND FREEZER TO FLOOR SINK. SEE RISER DIAGRAM <br />FOR ADDITIONAL INFORMATION. <br />21 NEW GAS WATER HEATER INSTALLED ON CONCRETE CURB. SEE ARCHITECTURAL DRAWINGS FOR <br />CURB DETAILS. SEE PLUMBING FIXTURE SCHEDULE FOR ADDITIONAL WATER HEATER INFORMATION. <br />22 WATER FILTER SYSTEM. REFER TO EQUIPMENT SCHEDULE FOR ADDITIONAL INFORMATION. <br />23 ROUTE SODA LINES WITHOUT CONDUIT FROM BAG -N -BOX OVERHEAD AND DROP IN NEARBY WALL <br />WITH CONDUIT AT SODA DISPENSER. COORDINATE DROP IN FIELD WITH SODA VENDOR. FIELD <br />VERIFY LOCATION. <br />24 POINT OF CONNECTION TO EXISTING 4" GREASE WASTE PIPING. VERIFY EXACT LOCATION, SIZE <br />DEPTH, DIRECTION OF FLOW AND PIPING MATERIAL WITH CIVIL DRAWINGS AND IN FIELD. <br />25 1/2"CW FROM TRAP PRIMER. SEE WATER RISER DIAGRAM AND PLUMBING FIXTURE SCHEDULE FOR <br />ADDITIONAL INFORMATION. <br />26 1 1/2" DRAIN UP THRU ROOF TO MA -1. COORDINATE LOCATION WITH MECHANICAL CONTRACTOR. <br />27 1" CONDENSATE DRAIN FROM ROOF TOP UNIT. <br />28 VENT PIPING BELOW GRADE. <br />BURGER GRILL <br />saal <br />Consultant <br />R <br />6 � <br />CSaEEg� <br />o <br />N <br />�aid°.3a <br />�d O6A <br />Q <br />M <br />TtTL 6-1L I 13,11L. <br />T -t121 ( 6-11L <br />SANITARY + GREASE WASTE PLAN <br />SCALE: <br />SANITARY/GREASE WASTE PLAN KEYED NOTES O <br />O1 NEW HAND SINK. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />O NEW PREP SINK. ROUTE 1 1/2" COPPER WASTE PIPE WITH INDIRECT CONNECTION TO FLOOR <br />SINK. PROVIDE AIR GAP PER CODE. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />O3 NEW ICE MAKER WITH BIN. ROUTE INDIRECT WASTE TO FLOOR SINK. PROVIDE AIR GAP PER CODE. <br />REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />O4 NEW URINAL. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />O NEW MOP SINK. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />O6 NEW 3 COMP SINK. ROUTE 1 1/2" COPPER WASTE PIPE WITH INDIRECT CONNECTION TO FLOOR <br />SINK. PROVIDE AIR GAP PER CODE. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />O NEW CARBONATOR/SODA RACK. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />OS NEW SODA MACHINE W/ICE MAKER ABOVE. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR <br />INFORMATION. <br />O NEW ICE TEA BREWER. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. FIELD <br />VERIFY. <br />10 NEW WATER CLOSET. REFER TO PLUMBING FIXTURE SCHEDULE FOR INFORMATION. <br />11 NEW LAVATORY. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />12 NEW FLOOR DRAIN. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />13 1-1/4" CONDENSATE DRAIN DOWN IN WALL AND TERMINATE INTO MOP BASIN WITH CODE <br />APPROVED AIR GAP. <br />14 NEW FLOOR SINK. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />15 NEW WALL CLEAN-OUT. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR INFORMATION. <br />16 SODA LINES FROM SODA SYSTEM TO SODA MACHINE. <br />17 4" GREASE WASTE TO JENSEN PRECAST JP1000 1000 GALLON EXTERIOR BELOW GRADE GREASE <br />INTERCEPTOR. PROVIDE PARKS SWP-244 SAMPLE WELL. SEE PROJECT CIVIL DRAWINGS FOR <br />ADDITIONAL DETAILS AND LOCATION. <br />18 POINT OF CONNECT TO EXISTING 4" SANITARY SEWER PIPING. VERIFY EXACT LOCATION, SIZE <br />DEPTH, DIRECTION OF FLOW AND PIPE MATERIAL OUT IN FIELD. <br />19 PROVIDED 3" VENT THRU ROOF. ENSURE VENT THRU ROOF IS AT LEAST 10'-0" AWAY FROM ALL <br />OUTSIDE AIR INTAKES. FIELD VERIFY LOCATION. <br />20 ROUTE CONDENSATE DRAIN FROM COOLER AND FREEZER TO FLOOR SINK. SEE RISER DIAGRAM <br />FOR ADDITIONAL INFORMATION. <br />21 NEW GAS WATER HEATER INSTALLED ON CONCRETE CURB. SEE ARCHITECTURAL DRAWINGS FOR <br />CURB DETAILS. SEE PLUMBING FIXTURE SCHEDULE FOR ADDITIONAL WATER HEATER INFORMATION. <br />22 WATER FILTER SYSTEM. REFER TO EQUIPMENT SCHEDULE FOR ADDITIONAL INFORMATION. <br />23 ROUTE SODA LINES WITHOUT CONDUIT FROM BAG -N -BOX OVERHEAD AND DROP IN NEARBY WALL <br />WITH CONDUIT AT SODA DISPENSER. COORDINATE DROP IN FIELD WITH SODA VENDOR. FIELD <br />VERIFY LOCATION. <br />24 POINT OF CONNECTION TO EXISTING 4" GREASE WASTE PIPING. VERIFY EXACT LOCATION, SIZE <br />DEPTH, DIRECTION OF FLOW AND PIPING MATERIAL WITH CIVIL DRAWINGS AND IN FIELD. <br />25 1/2"CW FROM TRAP PRIMER. SEE WATER RISER DIAGRAM AND PLUMBING FIXTURE SCHEDULE FOR <br />ADDITIONAL INFORMATION. <br />26 1 1/2" DRAIN UP THRU ROOF TO MA -1. COORDINATE LOCATION WITH MECHANICAL CONTRACTOR. <br />27 1" CONDENSATE DRAIN FROM ROOF TOP UNIT. <br />28 VENT PIPING BELOW GRADE. <br />BURGER GRILL <br />saal <br />Consultant <br />R <br />6 � <br />CSaEEg� <br />o <br />N <br />�aid°.3a <br />�d O6A <br />Q <br />M <br />�V <br />ao <br />c <br />L{) <br />Vv <br />v <br />c <br />�'oco <br />•� v <br />�og�o <br />Wo <br />W <br />3mm" <br />P afLL� <br />LU <br />N <br />LL! <br />Q <br />M <br />LL! <br />L{) <br />O <br />U <br />N <br />W <br />Q <br />LU <br />O <br />U <br />Of <br />>- <br />LLJ <br />O <br />w <br />z <br />M <br />Q <br />M <br />r <br />0 z <br />Q <br />ofCL <br />LLI <br />cf) <br />zQ <br />Q LLl <br />U <br />Project Number. 17-536 <br />Plan Check Number. <br />10/12/17 ISSUE FOR PERMIT <br />6/13/17 1 PLAN CHECK REVISION <br />7/12/17 COORDINATION <br />8123/17 FIELD REVISION <br />P200 <br />