Laserfiche WebLink
FILTER FABRIC AT PIPING TRENCH, PER COSTCO 99 <br /> SPECIFICATIONS. (US FABRICS US200 OR DUPONT SF 40) <br /> UNDERGROUND DETECTABLE <br /> HARRIS INDUSTRIES MODEL 2" PIPE SUPPORT RACK, J <br /> CDU-03 OR EQUIVALENT. INSTALL 6" PAVING VARIES PAINT WHITE 00 <br /> TO 12" BELOW SURFACE <br /> CONCRETE TMS CABINET MOUNT 194 W <br /> ON SUPPORT RACK ®0000 0000® 0 10 <br /> Z UNISTRUT CROSS BAR SUPPORT TMS SOLENOID 3/8" STAINLESS STEEL TUBING Z <br /> ATTACHED TO 3" STEEL Ir <br /> ®& FLOW METER O IN J <br /> VERTICAL <br /> EITH _B CABINET <br /> 3/4 x 1/8 REDUCER FITTING LLI U <br /> cn FILPIPE W <br /> FIELD LOCATE REQUIRED N Q Z U <br /> OLTS ®0000 000 N <br /> LL <br /> Q <br /> 3/4 DIA. x 15 S.S. J J <br /> o z 45 ¢ LLJ <br /> Qw ~ QU Z FLEX CONNECTOR 3/4 DIA. S.S. PRODUCT Z <br /> ; EXPLOSION-PROOF PIPE FROM VENT SUMP <br /> N\j\ — <br /> J <br /> J-BOX AND SEAL-OFF LLJ LL_ Z O <br /> GRADE V) N <br /> Ucn <br /> // (� <br /> / "MIN. \\\\\\\\\�\ � z <br /> j \\///\�/// `° CONDUIT TO VEEDER-ROOT PANEL 0 a <br /> AND INSTALL (4) 1 " CONDUITS TO 0-� <br /> X �//\\// /�� CONTROLLER ENCLOSURE VACUUM TUBE & 1 /4" O <br /> 6" MIN. FIBERGLASS 3" OVER 2" VENT AND 116 11004 <br /> BALL VALVE FOR � Cn Cn <br /> ADDITIVE PRODUCT PIPING LINE (TYP.) CONTINUITY TESTING (TYP.) Q Z C'7 � <br /> PROPYLENE GLYCOL > > Q � <br /> UNDISTURBED SOIL OR 2g 0 0 o Y <br /> COMPACT TO 95% SUMP RESERVOIR & NEW CONC. FOOTING, PER O <br /> HYDROSTATIC SENSOR BRAVO SPECIFICATIONS o 0 o T Z U <br /> NOTE: NOTE: NOTE: m m m W <br /> ALL VENT PIPING TO SLOPE TO MINIMUM PIPING BURIAL DEPTHS THE ABOVE DETAILS REPRESENT 33 DOUBLE WALL VENT SUMP m \ <br /> TANKS AT 1/4" PER FOOT SHOWN ARE IN ACCORDANCE WITH MINIMUM DESIGN AND INSTALLATION3" FRP BONDED 69 42 LIQUID SUMP SENSOR --- C`4(1/8" PER FOOT MINIMUM). SECTION 3.5.5.2 OF NFPA 30. REQUIREMENTS. o 114Qj <br /> FITTING (TYP. OF 5) <br /> Fiberglas Piping °° z <br /> Typical Piping Trenching Burial Details ("_F� TMS Cabinet Support Detail <br /> T6-1NOT TO SCALE c Not Used T6-1 NOT TO SCALE <br /> T6-1 SCALE: NONE <br /> A <br /> 0 <br /> W <br /> 3" SQUARE STEEL PIPE WITH CAP _ <br /> 194 TMS CABINET. MOUNT ON J <br /> 04 <br /> SUPPORT RACK Q W O <br /> BRAVO COMPRESSION FITTING (TYP.) 2"0 DIA. BLACK 2"0 DIA. BLACK BRAVO COMPRESSION FITTING (TYP.) UJ > 00 <br /> STEEL RISER (PAINT STEEL RISER (PAINT UNISTRUT CROSS BAR SUPPORT W 0) <br /> SINGLE WALL VENT SUMP 33 WHITE) (TYP.) WHITE) (TYP.) 33 SINGLE WALL VENT SUMP ATTACHED TO 3 STEEL VERTICAL O Q <br /> TMS SOLENOID PIPE WITH U-BOLTS FIELD LOCATE = W <br /> ®& FLOW METER AS REQUIRED <br /> GRADE GRADE ®0000 CABINET 0000® Q = <br /> 3 FRP BONDED FITTING (TYP.) 69 73 3 FRP BONDED FITTING (TYP.) 3/8" STAINLESS STEEL TUBING O J <br /> FIBER GLASS SYSTEMS 2" EZ-FIT X FEMALE 2" EZ-FIT X FEMALE FIBER GLASS SYSTEMS <br /> " 1 10 1 16 ° 205 205 1 10 1 16 3/4"x 1/8" REDUCER FITTING U O O <br /> 3 OVER 2 FRP VENT O NPT ADAPTER (TYP.) NPT ADAPTER (TYP.) O 3 OVER 2 FRP VENT O Q <br /> LINES (TYP.) 3/4"0 DIA. S.S. PRODUCT PIPE CO O <br /> LINES (TYP.) 43 2x18" FLEXIBLE 2x18" FLEXIBLE 4344 <br /> TO ADDITIVE TANK / / F E: FROM VENT SUMP <br /> CONNECTOR W EZ-FIT X CONNECTOR W EZ-FIT X TO GASOLINE TANKS U fn <br /> 2" EZ—FIT X FEMALE GLUE PIPE EZ—FIT FLANGE (TYP.) EZ—FIT FLANGE (TYP.) 2" EZ—FIT X FEMALE GLUE PIPE FINISHE45 3/4"O DIA. x15" S.S. FLEX <br /> FOR FIBERGLASS PIPING (TYP.) 204 201 2" EZ—FIT 90 DEGREE 2" EZ—FIT 90 DEGREE 201 204 FOR FIBERGLASS PIPING (TYP.) GRADED CONNECTOR GRADE FINISHED <br /> 2" EZ—FIT CLAMP W/ ELBOW (TYP.) ELBOW (TYP.) 2" EZ—FIT CLAMP W/ °a: <br /> 200 42 LIQUID SUMP SENSOR LIQUID SUMP SENSOR 42 200 A ° <br /> VITON SEAL (NP.) VITON SEAL (NP.) a 4° .6 a. 4° <br /> a <br /> d <br /> •/�) <br /> SECTION (GASOLINE TANK VENTS) b. o <br /> B-2 4. ° as d LL <br /> B-3 SECTION (ADDITIVE TANK VENT) <br /> ° <br /> DIAMETER X 3'-6" DEEP <br /> PRESSURE VACUUM _ VERTICAL PIPE CONCRETE FOOTING4. <br /> VENT RAIN CAP 20 21 VENT CAP 3/4"0 DIA. S.S. PRODUCT Co ° (1 PLACE) ° <br /> PIPE TO TMS CABINET <br /> 12' MINIMUM ABOVE GRADE 1/4" BALL VALVE TO TEST V-0" <br /> (MAY BE MOUNTED ON VACUUM CONTINUITY (TYP.) <br /> VENT RACK) 180 EMCO WHEATON <br /> ATMOSPHERIC AIR CAP F TMS CABINET SUPPORT DETAIL <br /> �A4103-002 3" FRP BONDED 69 <br /> 2"� DIA. BLACK STEEL FITTING (NP.) D53/4"x15" <br /> CONNECTORLEXIBLE <br /> T6-1 NOT TO SCALE <br /> VENT PIPE, PRIME & LINE OUT TO <br /> PAINT WHITE (TYP.) GASOLINE TANKS <br /> 33 <br /> pBRAVO VENT RACK FIBER GLASS 4 QR Nq <br /> SUPPORT RACK, PAINT WHITE SYSTEMS 3" OVER 2" FRP 110 116 2"X3/4" REDUCER FITTING COMPLIANCE NOTES FESS/0 <br /> ��o c <br /> PAINT WHITE ADDITIVE LINES (TYP.) 1. ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR REFERENCING ALL DIMENSIONS, PROPERTY LINES, ELEVATIONS AND = HAL P. GRUBB <br /> 2 X 3 BELL X EQUIPMENT LOCATIONS. <br /> XL DOUBLE WALL VENT 33 115 MALE FITTING 67814 70 <br /> N N � TRANSITION SUMP p Not Used 2. ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. ANY DISCREPANCY SHALL BE <br /> C14 O� • �O�O CALLED TO THE ATTENTION OF THE OWNERS ENGINEER FOR DECISION BEFORE PROCEEDING WITH THE WORK. <br /> o o SECTION (ADDITIVE PRODUCT) 3. GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM APPLICABLE AGENCIES FOR EXCAVATIONS OF TRENCHES 1.5 METERS 5'-0" OR s� �P <br /> '11-f o Q Q Q - 1 " TEE AND 1/4" TEST PORT B-5 T6-1 SCALE: NONE MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. ( ) 9TF V �\'0�� <br /> Q � J J � F CAL i <br /> z z z � 4. AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE SUBMITTED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK OPERATIONS. 05/27/22 <br /> > > > SEE SHEET T6-2 FOR 3/4"0 DIA. S.S. PRODUCT <br /> PROCESSOR TIE-IN 5. ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER NATIONALLY RECOGNIZED CODES, LOCAL CODES AND .. <br /> 2" TEE AND 1 /41, PIPE TO TMS CABINET GOVERNING AUTHORITIES. ;; 0 <br /> Q U Q i <br /> TEST PORT 6' TO 8' EXPLOSION-PROOF 1/4" BALL VALVE TO TEST STAGE I VAPOR RECOVERY 6. THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE WITH THE PRODUCT STORED. LO 0 z z <br /> ABOVE FINISH GRADE o f J-BOX AND SEAL-OFF VACUUM CONTINUITY (TYP.) FILL PORT o <br /> / 7. ALL MONITORING DEVICES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. 00 <br /> \ \ \ \ \ <br /> RADECONDUIT TO 8. GENERAL CONTRACTOR IS REQUIRED TO PROVIDE 72 HOUR (TYPICAL) NOTIFICATION TO GOVERNING AGENCY PRIOR TO TANK INSTALLATION. m N <br /> VEEDER-ROOT PANEL 69 3" FRP BONDED \ \ \ \ \ \ \ \ <br /> 3/4"x15" FLEXIBLE FITTING TYP. 9. TANK AND PIPING SYSTEM TO BE INSPECTED BY OWNER'S FUEL FACILITY INSTALLATION OVERSIGHT AGENT & GOVERNING AGENCY AT FOUR (4) <br /> VACUUM TUBE & 1 /4" AND INSTALL (4) 1 " CONNECTOR 45 _ ; ::. (TYP.) /\ \j / \ SEPARATE CONSTRUCTION PHASES (SEE SPECIFICATIONS): N o a cn <br /> BALL VALVE FOR CONDUITS TO LINE IN FROM ° A. TANK AIR TEST BEFORE SETTING IN HOLE AND SOAP TESTED IN ACCORDANCE WITH MANUFACTURER'S GUIDELINES. a o <br /> B. TANKS AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED IN ACCORDANCE WITH MANUFACTURERS GUIDELINES AND <br /> CONTROLLER ADDITIVE TANK <br /> CONTINUITY TESTING (TYP.) /\ \/ INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN ACCORDANCE WITH MANUFACTURER'S GUIDELINES. <br /> ENCLOSURE LIQUID SUMP SENSOR 42 \ \ \ C. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTION SYSTEM. <br /> 110 116 FIBER CLASS \ \ \ \ \ \ \ D. 30-DAY POST CONSTRUCTION INSPECTION (G.C. AND FUEL FACILITY INSTALLATION OVERSIGHT AGENT ONLY). V E <br /> NEW CONC. FOOTING, PER 26 PROPYLENE GLYCOL SUMP 2"X3/4" REDUCER FITTING SYSTEMS 3" OVER 2" FRP /\ \�/, / O o <br /> BRAVO SPECIFICATIONS RESERVOIR & HYDROSTATIC 2" X 3" BELL X ADDITIVE LINES (TYP.) / / / / 10. ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDROSTATICALLY TESTED (LAKE TEST) WITH LIQUID TO TOP OF SUMPS — V � <br /> 115 SYMBOL WITH COLORS \ \ \ \ FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT PER CODE. LAKE TEST TO COMMENCE DAY PRIOR TO THIRD PARTY CO <br /> 3" FRP BONDED FITTING 69 SENSOR MALE FITTING XL DOUBLE WALL VENT / / / <br /> 73 3" FRP BONDED FITTING TYP. 33 TRANSITION SUMP ° INSPECTOR BEING ON SITE FOR PIPING INSPECTION. THIRD PARTY INSPECTOR TAKES PHOTOS AND RECORDS RESULTS OF TEST. G.C. TO RECORD <br /> (TYP.) <br /> WHITE COLOR BY PHOTO THE TEST RESULTS AND SUBMIT TO ARCHITECT PROJECT MANAGER. C 3 E <br /> LIQUID SUMP SENSOR 42 33 DOUBLE WALL VENT SUMP 11. TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK � t <br /> SECTION (ADDITIVE PRODUCT) ACCESS PORT C <br /> B-4 SYSTEM BEING PLACED IN OPERATION. •— O I o <br /> VENT STACK ELEVATION `n m <br /> 2"0 DIA. BLACK PRODUCT SYMBOL COLORS 12. PRIOR TO FIRST FILL, FUEL FACILITY MUST HAVE VEEDER ROOT FUNCTIONAL WITH MONITORING ANNULAR SPACES OF TANK AND DISPENSER SUMPS C <br /> FIBER GLASS SYSTEMS 3" OVER CONFIRMED AND COMMUNICATIONS ESTABLISHED WITH THE 24-7 MONITORING COMPANY. WC <br /> M <br /> 2" FRP VENT LINES TYP 110 116 STEEL VENT PIPE REGULAR UNLEADED <br /> ( 73 XL DOUBLE 33) (TYP.) GASOLINE + BLACK CROSS ON WHITE CIRCLE 13. PAYMENT OF ALL APPLICABLE UST OPERATING FEES SHALL BE SUBMITTED TO THE GOVERNING JURISDICTION WITHIN 30 DAYS OF THE FINAL > 0 <br /> 3" FRP BONDED FITTING (TYP. OF 4) 00 N o <br /> d) N <br /> 2" TEE AND 1 ORANGE 14. EVIDENCE OF FINANCIAL RESPONSIBILITY SHALL BE SUBMITTED TO GOVERNING AGENCY (BY OWNER).4" WALL PIPING IN I N. � +'' � Q o <br /> 3" FRP BONDED FITTING 69 / VAPOR RECOVERY :3TEST PORT 6' TO TRANSITION SUMP t 0 <br /> 15. TURBINE SUMPS SHALL BE EQUIPPED WITH NON-DISCRIMINATING LIQUID LEAK SENSORS AND WIRED FOR TURBINE SHUTDOWN. FILL/VR SUMPS SHALL 0 <br /> 8 ABOVE FINISH 1 o DIA. 1 16 1 10 FIBER GLASS BE EQUIPPED WITH NON-DISCRIMINATING LIQUID LEAK SENSORS AND WIRED FOR AUDIBLE ALARM. Q N C L <br /> GRADE COMPRESSION m U Y <br /> 2"� DIA. BLACK STEEL FITTINGS TYP. SYSTEMS 3 OVER 16. MEASUREMENTS OF BRINE LEVELS SHALL BE TAKEN BY G.C. AND WITNESSED BY OWNERS FUEL FACILITY INSTALLATION OVERSIGHT AGENT DURING r <br /> (TYP.) 2" FRP ADDITIVE THREE SEPARATE VISITS TO SITE AND PRIOR TO FUELING OPERATIONS. REFER TO TANK MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR i <br /> RISER (PAINT WHITE) (TYP.) U U U U g-1 3" FRP BONDED LINES (TYP. OF 5) REQUIREMENTS. <br /> FITTING FOR 69 17. TANK TEST METHOD: BEFORE THE UNDERGROUND STORAGE TANK IS PLACED INTO USE, THE UNDERGROUND STORAGE TANK SHALL BE TESTED <br /> ° <br /> ADDITIVE LINES 194 - <br /> TMS CABINET ON AFTER INSTALLATION USING ONE OF THE FOLLOWING METHODS TO DEMONSTRATE THAT THE TANK SYSTEM IS PRODUCT TIGHT: w <br /> XL VENT DOUBLE WALL 33 _3 B-2 A STANDALONE 1) ENHANCED LEAK DETECTION ELD TEST (TRACER TIGHT TM) BY PRAXAIR OR LICENSED AFFILIATE. <br /> TRANSITION SUMP (TYP. OF 5) SUPPORT RACK 2) AN INERT GAS PRESSURE TEST THAT HAS BEEN CERTIFIED BY A THIRD PARTY AND APPROVED BY THE BOARD <br /> B-5 3) A TEST METHOD DEEMED EQUIVALENT TO ENHANCED LEAK DETECTION OR AN INERT GAS PRESSURE TEST BY THE BOARD IN REGULATIONS <br /> ADOPTED PURSUANT TO THE APPLICABLE CHAPTER IN THE CODE. AN UNDERGROUND STORAGE TANK INSTALLED AND TESTED IN ACCORDANCE <br /> VENT STACK PLAN ADDITIVE PIPING TRANSITION SUMP PLAN WITH THIS SECTION IS EXEMPT FROM THE REQUIREMENTS OF CALIFORNIA HEALTH AND SAFETY CODE SECTION 25292.5. <br /> U <br /> N <br /> 18. CONTRACTOR AND OWNER'S REGULATORY COMPLIANCE TESTING AGENT TO ASSURE THAT ALL TESTING IS PERFORMED IN ACCORDANCE WITH E <br /> SECTION 11149 OF THE PROJECT SPECIFICATIONS. 0 <br /> B Vent Stack Detail and Additive Piping Transition Sump Detail _ CDCD <br /> E Fill Port Lid Cover Colors 19 <br /> EQUIPMENT ONEPORTABLE <br /> OFOR BT E THE TRANSF ER OF FLAMMABLE LIQUIDS O OR OCOMBUSTIBLE BLIQUIDS. ATDLEAST"2 POABLE EXTINGUISHERS HAVING RA Tco <br /> AT LEAST FIRE :C SHALL IN 0 <br /> T6-1 NOT TO SCALE RATING OF NOT LESS THAN 60-B: C SHALL BE PROVIDED AT DISPENSING ISLANDS. LO o <br /> CD <br /> T6-1 SCALE: 1 "=l '-O" 20. SIGNS IN CONFORMANCE WITH CFC SHALL BE PROVIDED AT EACH DISPENSING LOCATION, BY OWNER. � N <br />