Laserfiche WebLink
SAN JOAQUIN VNEY UNIFIED AIR POLLUTION Mi,4TROL DISTRICT <br /> Compliance Assistance Bulletin- December, 1994 <br /> Asbestos Synopsis <br /> Prior to any renovation or demolition of a facility <br /> Insp :Conduct an asbestos Inspection of the site before: <br /> -Any renovation which 160 sq.ft.of building materials,or 260 linear feet of pipe insulation will be disturbed,or <br /> -Any demolition of a facility with or without asbestos-containing materials <br /> Notify:Submit an asbestos notification form for any regulated renovation or demolition, 10 working days before the activity. <br /> Fees:Fees must be paid to the District with the notification for all regulated renovations and demolitions. <br /> Demolition Release Form:Prior to any demolition,you must have completed a demolition release form.Upon its approval by the <br /> District this signed form may be used as proof(needed by the building official)of compliance with,or exemption from,the <br /> NESHAP notification requirements. <br /> Submit this form to the building department with your application for a demolition permit. <br /> Applicability <br /> Facilities subject to the NESHAP(regulated facilities)include all commercial buildings,apartments with more than 4 units,other <br /> structures and non-portable equipment.Single family dwellings may be exempt,but only on a case by case basis. <br /> Demolitions subject to the NESHAP(regulated demolitions)are demolitions of facilities described above,whether or not asbestos <br /> is present. <br /> Regulated renovation applies to any activity in which 160 sq.ft.of regulated asbestos-containing building materials or 260 linear <br /> feet of asbestos-containing pipe insulation is disturbed at a regulated facility. <br /> Definitions <br /> Facilities: Facilities subject to the rule include "all structures, installations, buildings and <br /> equipment,except for single family dwellings and apartments with four or fewer dwelling <br /> units." Single family dwellings and apartments are also subject to the regulation if: <br /> --There is more than one building at a site being renovated or demolished,or <br /> -The building had been used for,or is being removed for a commercial or public use,or <br /> is to be used as a training bum exercise. <br /> Demolition: In addition to the total destruction of a structure,demolitions include"the removal of any <br /> structural load-bearing member from a facility together with any related handling <br /> operations or the intentional burning of a building: (training burns conducted by a fire <br /> fighting agency). Also, the separation of a structure from its foundation prior to <br /> relocation is a demolition. <br /> Renovation: Altering a facility or one or more facility components in any way,including the stripping or <br /> removal of regulated asbestos-containing material (RACM) from a facility component. <br /> Renovations include all activities in which asbestos could be disturbed at a regulated <br /> facility,including the clean up and removal of debris from buildings which have burned. <br />