Laserfiche WebLink
SAN JOAQUIN VA . . =Y UNIFIED AIR POLLUTION CG. .'ROL DISTRICT <br /> Compliance Assistance Bulletin- December, 1994 <br /> Asbestos Synopsis <br /> Deflnitlons,Continued <br /> Regulated Asbestos-Contalning (1)Friable asbestos-containing material(ACM). <br /> Materials fRACMI Include: (2)Category 1 nonfriable ACM in poor condition and"has become friable"or that has or <br /> will be subjected to sanding,grinding,cutting,or abrading. <br /> (3)Category If nonfriable ACM that has a high probability of becoming,or as become, <br /> crumbled,pulverized,or reduced to powder by the forces expected to act on the material <br /> in the course of demolition or renovation. <br /> Friable Asbestos-Containing Any material containing more than 1 percent asbestos,as determined by Polarized Light <br /> Matarial(ACM): Microscopy(PLM)testing,which,when dry,can be crumbled,pulverized,or reduced to <br /> powder by hand pressure. <br /> Category I nonfriable ACM: Any asbestos-containing packings,gaskets,resilient floor coverings,and asphalt roofing <br /> products containing more than 1 percent asbestos as determined by PI-M testing. <br /> Category II nonfriable ACM: Any asbestos-containing materials,excluding Category 1 ACM,containing more than 1 <br /> percent asbestos as determined by PLM testing,which when dry,cannot be crumbled, <br /> pulverized,or reduced to powder by hand pressure. <br /> Inspmaion:done by,or under the direction of a Cal-OSHA certified consultant prior to: <br /> • Any regulated demolition. <br /> • Any renovation activity in which more than 160 sq.ft.of any building material or 260 linear feet of pipe insulation will be disturbed. <br /> An Inspection is not required if the material to be disturbed is stipulated to be asbestos-containing and will be removed in <br /> accordance with the NESHAP. <br /> Inspection Report Must Include: <br /> • A schematic showing the location of all tested materials. <br /> • The following data for all asbestos-containing materials: <br /> 1.The amount and description of each material. <br /> 2.Percent asbestos content. <br /> 3.Whether or not the material is friable. <br /> Notification: An asbestos notification must be submitted to the District at least 10 working daysrim•or toe <br /> 1.Any regulated demolition. <br /> 2.Any renovation in which more than 160 sq.ft.or 260 linear ft.of RACM will be disturbed. <br /> A copy of the Asbestos Inspection Report must be Included with the Notification. <br /> Notification will not be considered complete,nor will the 10 working day notice period begin until all required information and fees <br /> have been submitted to the District. <br /> Eees:District Rule 3050 requires that nonrefundable asbestos fees be received along with asbestos job notifications. Fees must <br /> be paid for regulated asbestos abatement projects and regulated demolition projects,whether or not asbestos isr�es_ <br /> Demolition Release Form:The California Health and Safety Code requires that the city or county building official have proof of <br /> compliance with,or exemption from,the asbestos notification requirement before he or she issues a demolition permit. <br /> After the District has received a demolition notification and is satisfied that the NESHAP notification requirements have been <br /> complied with,the District will issue a Demolition Release Form to the person who submitted the notification. <br /> Recycle and Waste Disposal:The asbestos notification must also identify any building materials which will be recycled after <br /> removal from a project. The name of the recycling contractor and location of such activity must be identified. <br />