My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014956
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
5790
>
2600 - Land Use Program
>
PP-96-1
>
SU0014956
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:20 PM
Creation date
6/7/2022 12:07:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014956
PE
2600
FACILITY_NAME
PP-96-1
STREET_NUMBER
5790
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242-
APN
05516071
ENTERED_DATE
5/24/2022 12:00:00 AM
SITE_LOCATION
5790 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Development Committee -3- <br /> PD-96-1 <br /> Based upon this, all of the lots along Jack Tone Road would be <br /> subject to excessive noise, and an acoustical study will, <br /> therefore, be required. This should be submitted with the full <br /> application materials for the PD. <br /> Archaeological/Cultural Resources: <br /> Volume II of the General Plan contains Implementation Measures <br /> specific to the Community of Lockeford. Implementation Measure <br /> number 1 (p. VI-15) is as follows: <br /> 1. An archaeology study and report shall be required for <br /> all discretionary applications along the Mokelumne <br /> River and within 100 feet of the centerline of Bear <br /> Creek to protect any store age artifacts remaining <br /> there. <br /> Given the site' s proximity to Bear Creek, and the existence of <br /> the oak grove to the north of the area to be developed, it is <br /> likely that the site may contain pre-historical cultural <br /> resources. Based upon this and the General Plan requirement, a <br /> Cultural Resource Survey should be prepared and submitted with <br /> the full application materials. <br /> Proposed Lake: <br /> During the public hearing on the previously approved project for <br /> this site, the issue of the proposed lake became somewhat <br /> controversial. Specifically, neighbors were concerned that <br /> groundwater pumping to fill the lake and maintain water levels <br /> during summer months may adversely affect the areas water table. <br /> At that time, the applicants were proposing to pump water from a <br /> shallow, non-potable aquifer. The applicants should provide more <br /> detailed information regarding the proposed lake when the full <br /> application is submitted. <br /> PD Application: <br /> Attached is the checklist from the PD application that lists the <br /> required materials and information that must be included in the <br /> full PD application. To expedite processing, the applicants may <br /> wish to process a combined Phase I/II application. In either <br /> case the applicant will also need to file a Major Subdivision <br /> application with the PD application. <br />
The URL can be used to link to this page
Your browser does not support the video tag.