Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis Conditions o <br /> Section tency Approval <br /> I Heading# Title Text Y/N/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> Contents of the Hazardous Materials ManaEement <br /> per, The Plan shall include the following <br /> requirements: Storage of hazardous chemicals shall <br /> be carried out in compliance with all applicable safety <br /> regulations and designed in accordance with the <br /> Uniform Fire Code. <br /> A locked storage area shall be designated for each <br /> chemical with protection from fire. Incompatible <br /> chemicals shall not be stored in the same area. <br /> The handling of hazardous materials shall only be <br /> done by qualified personnel. Authorized personnel <br /> shall be required to wear proper safety attire for the <br /> type of chemical being handled. <br /> Solid Waste <br /> (Hazardous The appropriate ventilation and respiratory protection <br /> Materials from shall be provided for the type of chemicals that will be <br /> Treatment utilized. <br /> 607 6.7.IJ Plants) N/A See#606 None. <br /> POTENTIAL <br /> SITE <br /> 608 6.8 HAZARDS <br /> A PG&E owned 6/8-inch diameter natural gas pipeline The subject gas line currently runs through the <br /> (Line#176), which runs northwest to southeast, northeast corner of Neighborhood F. As stated in the <br /> crosses Byron Road and Patterson Pass Road,and is Joint Gas Pipeline Relocation Plan submitted with the <br /> Fuel Lines and being proposed for relocation along Byron Road and application,the pipe line will be re-routed along <br /> 609 16.8.I.a lPipelines lCentral Parkway, I Y lCentral Parkway to De Anza Blvd. COA-25 <br /> 10/03/2000 MHMP.CHECKLIST-928 Page139 <br />