Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis- Conditions o <br /> Section tency Approval <br /> 1 Heading# Title Text Y/NMA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> A PG&E owned 26-inch diameter natural gas pipeline, <br /> Fuel Lines and which runs northwest to southeast,and crosses Grant <br /> 610 6.8.1.b Pipelines Line Road in the southern portion of the project, N/A Not a part of Neighborhood F. None. <br /> A PG&E owned,36-inch diameter natural gas pipeline <br /> Fuel Lines and is located adjacent and parallel to the existing 26-inch <br /> 611 6.8.Lc Pipelines diameter PG&E natural gas pipeline, N/A Not a part of Neighborhood F. None. <br /> Will be relocated as part of Neighborhood "F" <br /> Fuel Lines and A Chevron owned 6-inch diameter petroleum products Improvement Plans. See Joint Pipeline Relocation <br /> 612 6.8.I.d Pipelines pipeline located along the Byron Road right-of-way, Y Plan. COA-25 <br /> A Chevron owned 18-inch diameter crude oil pipeline <br /> Fuel Lines and located adjacent and parallel to the existing 26-inch <br /> 613 6.8.Le Pipelines diameter PG&E natural gas pipeline, N/A None. <br /> A Santa Fe Pacific owned 12-inch diameter crude oil Will be relocated as part of Neighborhood "F" <br /> Fuel Lines and pipeline located within the Southern Pacific Railroad Improvement Plans. See Joint Pipeline Relocation <br /> 614 6.8.1.f Pipelines right-of-way. Y Plan. COA-25 <br /> To protect against fuel releases which could negatively <br /> Fuel Lines and impact the quality of groundwater resources,soils,and Addressed by Emergency Preparedness Plan and Joint <br /> 615 6.8.I.O.a Pipelines public health and property. Y Pipeline Relocation Plan submitted with application. COA-25 <br /> To minimize the risk of human injury or property <br /> Fuel Lines and damage in the event of an explosion and/or fire at a Addressed by Emergency Preparedness Plan and Joint <br /> 616 6.8.1.0.b Pipelines natural gas pipeline. Y Pipeline Relocation Plan submitted with application. COA-25 <br /> Prior to any construction,appropriate plans,operating <br /> Fuel Lines and procedures and safeguards shall be undertaken to Construction protocol will be subject to Pipeline <br /> 617 6.8.].P.a Pipelines insure safety in the area of fuel lines and pipelines. Y Agency requirements. COA-25 <br /> 10/03/2000 MHMP.CHECKLIST-928 Page140 <br />