Laserfiche WebLink
MOUNTAIN HOUSE <br /> SPECIFIC PLAN 1 CONSISTENCY FINDINGS <br /> Section Consist- Conditions <br /> Heading ency Finding of Fact and Evidence of of Approval <br /> I # Title Text Y/N/NA Compliance (COA) <br /> The initial wastewater treatment plant will include an influent pump <br /> station,aerated lagoons,a disinfection system, and ancillary <br /> 13.4.1(a)( Initial Treatment facilities, including tertiary facilities if needed. Disinfection shall be <br /> 244 i) Plant provided by use of liquid sodium hypochlorite. Y See #234 None. <br /> The layout shown in Figure 13.2 is based on the construction of I) <br /> the first phase of the influent pump station,2)the aerated lagoons, 3) <br /> the first phase of the disinfection system,and 4)ancillary facilities, <br /> including tertiary facilities if needed initially. These facilities will <br /> 13.4.](a)( Initial Treatment be expanded or placed into alternative uses when the SBRs are <br /> 245 ii) Plant constructed to serve development beyond the first neighborhood. Y See#234. None. <br /> During the time that the aerated lagoons are in service, wastewater <br /> 13.4.1(a)( Initial Treatment solids will accumulate and decompose at the bottom of the aerated <br /> 246 iii) Plant lagoons, but will be so small as to not require disposal off-site. N/A None. <br /> The SBR treatment plant to be constructed during Specific Plan 1 <br /> will be the first phase of the Master Plan build-out system. The SBR <br /> plant will include a headworks(influent screens,pumps and grit <br /> removal),the SBR system,disinfection system, sludge handling <br /> facilities and ancillary facilities, including tertiary treatment The SBR system will not be required <br /> SBR Treatment facilities if needed, consistent with RWQCB permitting until subsequent phases of the <br /> 247 13.4.2(1) Plant requirements. N/A community. None. <br /> SBR Treatment Two SBR basins will be constructed prior to development of the <br /> 248 13.4.2(2) Plant second neighborhood. N/A Not applicable to Neighborhood F. None. <br /> SBR Treatment Disinfection using sodium hypochlorite will be continued when the <br /> 249 1 13.4.2(3) Plant SBR system is installed. N/A See#241 lNone. <br /> 09/29/2000 SP-924(finaIFIN DING S) Page54 <br />