Laserfiche WebLink
MOUNTAIN HOUSE <br /> SPECIFIC PLAN 1 CONSISTENCY FINDINGS <br /> Section Consist- Conditions <br /> Heading ency Finding of Fact and Evidence of of Approval <br /> 1 # Title Text Y/N/NA Compliance (COA) <br /> The SBR system will produce sludge that will have to be dewatered <br /> and disposed of off-site. Dewatering could be by use of felt filter <br /> presses to attain a solids content of a level consistent with disposal <br /> requirements. After the process is established and the sludge can be <br /> tested and characterized, agricultural land application by contract <br /> operations may be practiced. If this is done, the sludge would have <br /> to be further stabilized, probably by lime treatment. The tertiary <br /> treatment system, if needed,will consist of chemical coagulation <br /> SBR Treatment facilities, flocculation basins, fitters enhanced sodium hypochlorite <br /> 250 13.4.2(4) Plant disinfection facilities,and ancillary facilities. N/A See#240 None. <br /> Control building with suitable laboratory facilities and a <br /> maintenance building will be constructed as required by RWQCB <br /> SBR Treatment and the CSD to support the operation of the wastewater treatment <br /> 251 13.4.2(5) Plant plant with SBRs. N/A See 4240 None. <br /> CHAPTER <br /> FIFTEEN: <br /> STORM <br /> DRAINAGE AND <br /> FLOOD <br /> 270 15 PROTECTION <br /> STORM <br /> 271 15.1 DRAINAGE <br /> The Master Plan describes off-site watersheds and presents policies <br /> and implementation measures that apply to Specific Plan I. The <br /> Master Plan and its appendices provide for off-site drainage to be <br /> applied to the Specific Plan Area. Issues Which Require Special <br /> 273 15.1.3(1) Off-Site Drainage Consideration are as Follows: <br /> 09/29/2000 SP-924(finaIFINDINGS) Pa9 e55 <br />