Laserfiche WebLink
MOUNTAIN HOUSE <br /> SPECIFIC PLAN 1 CONSISTENCY FINDINGS <br /> Section Consist- Conditions <br /> Heading ency Finding of Fact and Evidence of of Approval <br /> I # Title Text YIN/NA Com fiance (COA) <br /> The CSD has reviewed and adopted a <br /> "Neighborhood F Storm Water Report" <br /> which has been reviewed and approved <br /> as consistent with all applicable Speicific <br /> Downstream Floodine. Farmlands downstream of the Specific Plan Plan and Master Plan policies. The <br /> Area shall not be allowed to flood to any increased degree over that report indicates that flooding <br /> 15.1.3(1) which would have occurred prior to the development of the Specific downstream of the subdivision area will <br /> 274 a Off-Site Drainage Plan Area. Y not be increased beyond historic levels. COA-94,96 <br /> The CSD has reviewed and adopted a <br /> "Neighborhood F Storm Water Report" <br /> which has been reviewed and approved <br /> as consistent with all applicable Speicific <br /> Interception of Off-Site Drainage. Pipes, ditches and/or open Plan and Master Plan policies. The <br /> channels shall be used to control and direct off-site drainage at the report incorporates a series of <br /> Specific Plan boundary and transport the runoff with flood recommended improvements which <br /> 15.1.3(1) protection through the Specific Plan Area at the 100-year flow rates include a combination of pipes,ditches <br /> 275 b Off-Site Drainage as specified in the Master Plan. Y and open channels. COA-94,96 <br /> Mountain House Business Park Requirements. Off-site runoff from <br /> watersheds D, E,and M near the Mountain House Business Park <br /> shall not impact the park. Any flows that might top and enter the <br /> 155 canal shall flow through the replacement pipeline to the existing <br /> drainage system east of Patterson Pass Road. Further drainage <br /> 15.1.3(1) analysis shall be required prior to the application of any <br /> 276 c Off-Site Drainage Development Permit for the Mountain House Business Park. N/A Not applicable to Neighborhood F. None. <br /> The primary storm drain collection system includes trunk storm <br /> drain pipes(72 inches and larger),major open channels, and <br /> detention basins. A detailed description of the primary storm drain <br /> Primary Storm collection system and the analysis of the system is contained in the <br /> 277 15.1.4(1) Drain Collection Master Plan and its technical appendices. Y See#275 COA-94,96 <br /> 09/29/2000 SP-924(finaIFINDINGS) Page56 <br />