My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014674
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
20043
>
2600 - Land Use Program
>
SU-00-03
>
SU0014674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:34:36 PM
Creation date
6/16/2022 3:22:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014674
PE
2600
FACILITY_NAME
SU-00-03
STREET_NUMBER
20043
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
APN
20908020
ENTERED_DATE
12/21/2021 12:00:00 AM
SITE_LOCATION
20043 MOUNTAIN HOUSE PKWY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1994 Master EIR was prepared. However, the overall cumulative analysis is still <br /> applicable, especially in terms of the project's relative contribution to the overall <br /> cumulative impacts identified. In addition,the 1994 Master EIR focused on the <br /> cumulative impacts of the overall buildout of the Mountain House New Community. The <br /> adopted Master Plan for Mountain House is consistent with the buildout projections <br /> evaluated in the 1994 Master EIR. <br /> No substantial changes have occurred in the cumulative traffic analysis which would <br /> require major revisions to the 1994 Master EIR. Cumulative traffic impacts have been <br /> recalculated for 2010 using the same accelerated build-out assumptions for Mountain <br /> House as the 1994 Master EIR, but with current regional housing, employment and traffic <br /> projections. The traffic study found that projected cumulative traffic conditions are <br /> essentially of similar or lower overall volumes than documented in the 1994 Master EIR <br /> resulting in generally similar or lower cumulative traffic volumes. <br /> Cumulative traffic impacts are also essentially similar or of lower impact than the 1994 <br /> Master EIR. The Initial Study traffic study found substantial decreases in freeway and <br /> highway traffic on 7 of the 9 segments evaluated and small increases on two segments. <br /> All freeway/highway segment levels of service remained the same or improved in <br /> comparison to the 1994 Master EIR traffic analysis. Of the 24 arterial road segments <br /> evaluated, 11 had similar levels of service, 11 had improved levels of service, and two, <br /> Grant Line Extension and Tracy Boulevard north of Lammers Road, had decreased levels <br /> of service. The few road segments with lower levels of service can be mitigated with <br /> measures similar to that proposed in the MEIR. The proposed Grant Line Road <br /> Extension which is currently projected to have LOS "D"in comparison to prior MEIR <br /> projections of LOS "C"can be mitigated by amending the LOS standard from"C" to "D" <br /> as was done for Grant Line Road within Mountain House, or by widening the road from <br /> four to six lanes. A portion of the proposed roadway within one-quarter mile of I-205 <br /> already is designated for a LOS "D" standard under the Tracy General Plan. Tracy <br /> Boulevard north of Lammers Road is projected to decrease in Level of Service from LOS <br /> "C"to LOS "D" in A.M. and LOS "E" in P.M. This impact can be mitigated by adding <br /> the roadway to the San Joaquin County Traffic Impact Mitigation Fee (TIME)program at <br /> the appropriate time for widening from two to four lanes. The added mitigation measures <br /> are to be incorporated into the environmental documentation for the Neighborhood F <br /> Project which will be tiered onto the MEIR. As such, no major revisions are needed to <br /> the MEIR to incorporate these changes. <br /> Some roadway segments have improved levels of service that now require no mitigation <br /> improvements for 2010. However, it is expected that these improvements will still be <br /> needed in the future beyond 2010. The Master Plan and MEIR require a full traffic <br /> impact analysis for each Specific Plan; and at that time,additional traffic studies will be <br /> prepared for cumulative traffic impacts with an expanded time frame. <br /> The growth inducing impacts addressed in the 1994 Master EIR are still applicable to the <br /> project, as conditions at and around the project site have not changed significantly since <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.