Laserfiche WebLink
14. Biological Resources <br /> The biological resources of the proposed project has been reviewed in the Neighborhood"F"Project <br /> Initial Study, SCH#90020776. Based on this review,conditions of approval have been identified for <br /> impacts found to be less than significant. These are to be included with other conditions of approval <br /> developed for the proposed project. <br /> In assessing the impacts that the proposed project would have on biological resources within and <br /> adjacent to the site,the Neighborhood"F"Project Initial Study, SCH#90020776 noted the following: <br /> • Of the 49 trees identified within the proposed project, none were rated as having a good <br /> suitability for preservation; 13 were rated as having moderate suitability; and 36 had a low <br /> rating for preservation. <br /> • Wildlife observed during a 1999 on-site survey included species common to urban and <br /> agricultural areas. No important nesting or denning activity was observed on or in the <br /> immediate vicinity of the site. <br /> • No special-status plant populations or essential habitat for special-status animal species were <br /> encountered during 1999 surveys or are suspected to occur on the site. <br /> • No jurisdictional wetlands (i.e., those wetland features for which the California Department of <br /> Fish and Game (CDFG) and the U.S. Army Corps of Engineers have jurisdiction with respect <br /> to proposed modifications) occur within the proposed project site. <br /> • All activities along Mountain House Creek that would occur as a result of the proposed project <br /> (i.e., installation of pipelines) are to be done using a jack-and-bore technique to avoid the <br /> need for obtaining Streambed Alteration Agreements. <br /> • Detailed mitigation measures addressing the potential impacts of development on special- <br /> status species were incorporated into the 1993 and 1994 EIRs, and were adopted as part of <br /> the Findings for Master Plan approval. <br /> • Mitigation measures included in the large-lot map approval for the proposed project site in <br /> 1999 included payment of fees for the San Joaquin County Multi-Species Habitat <br /> Conservation and Open Space Plan (SJMSCP) to mitigate potential impacts on special- <br /> status species and biological resources in general, or implementation of the adopted Mountain <br /> House Multi-Purpose Habitat Management Plan (HMP) if the SJMSCP is not adopted within 5 <br /> years. <br /> Note: Until the SJMSCP is adopted, Trimark would pay an interim assessment of$2,600 <br /> per acre of land converted to urban use. The assessment would be due at the time <br /> grading activities and disturbances associated with road construction and the installation <br /> of underground utilities is initiated. Participation in the SJMSCP would address all <br /> potential take issues related to special-status species and compliance with the state and <br /> federal Endangered Species Acts. If the SJMSCP is not adopted, Trimark would need to <br /> implement the HMP, and, if necessary, obtain any legally required incidental take permits <br /> pursuant to the State and Federal Endangered Species Acts. <br /> • No sensitive natural community types occur with the proposed project, and no adverse <br /> impacts on riparian or other sensitive natural community types are anticipated. <br /> • Development of the proposed project site is not expected to interfere substantially with the <br /> movement of wildlife or impede the use of any native wildlife nursery areas. <br /> -14- <br />