Laserfiche WebLink
Water and Potable Water, as well as the CSD Development Standards have been reviewed and <br /> approved by County Staff, and are anticipated to be heard for approval by the CSD Board of <br /> Directors in January, 2000, prior to anticipated action by the County Planning Commission on <br /> Tract 2925. <br /> i. Access rights shall be dedicated and restricted for lots 4,5,6 and 7 along the frontage of ivlountain <br /> House Parkway. Compliance: A note has been placed on the proposed Tentative Tract vlap, <br /> which specifically restricts access along all parcels proposed for subdivision along Niountain <br /> House Parkway. <br /> 1. The PG&E regulator station parcel should be a separate parcel and not included in the roadway <br /> right-of-way. Compliance: A separate parcel has been proposed on the proposed Tentative <br /> Tract Map for the PG&E Regulator Station. <br /> n. Any easements shown on the Tentative Map and noted to be abandoned that belong to the Byron <br /> Bethany Irrigation District (BBID) shall not be abandoned without prior approval from BBID. <br /> Compliance: This same condition will likely be placed on the Unit 2 Map. No existing BBID <br /> easements which currently traverse the subdivision area will be abandoned without BBID's <br /> approval. It is the intent of Trimark Communities to submit detailed plans to BBID which <br /> delineate specific farm areas that will be removed from production and when, the nature of any <br /> impacts to existing BBID irrigation systems and a plan which details how facilities to be impacted <br /> will be resolved to the satisfaction of BBID. These plans and studies have been addressed in <br /> Section 12 of this Binder, and detailed plans and construction plans will be prepared and <br /> reviewed/approved by BBID as part of the Final Map process, prior to construction in areas that <br /> affect BBID. <br /> o. A joint relocation plan for the eight-inch underground gas line that bisects Lots 4 and 5 shall be <br /> completed prior to Final vlap Recordation. This plan can either relocate the line off the site, or <br /> it can integrate the gas line into the infrastructure plan for the subdivision. This plan must be <br /> approved by both PG&E and the MHCSD. Compliance: Section 15 of this Binder includes the <br /> Joint Gas Pipeline Relocation Plan,prepared by Precision Planning on behalf of the ivIHCSD and <br /> PG&E. <br /> 4. DEPARTMENT OF PUBLIC WORKS <br /> a. A"will serve" letter with conditions from the Mountain House Community Services District <br /> (N1HCSD) is required for public water, sewer, drainage, and street lighting services prior to <br /> or concurrently with the filing of the "small lot" tentative map for Neighborhood F. Said <br /> language shall be noticed by a statement on the Final iNlap. Compliance: Section 8 of this <br /> Binder includes the required Will Serve Letter from the MHCSD. <br /> 5. PUBLIC HEALTH SERVICES <br /> d. For areas located within 500 feet of any pipeline, a preliminary site assessment shall be <br /> prepared prior to submittal of a tentative map by a qualified professional in compliance with <br /> the requirements of the San Joaquin County Public Health Services. If contamination is <br /> identified, an investigation and remediation shall be undertaken in accordance with the <br /> requirements of the County and the Regional Water Quality Control Board. Compliance: <br /> Sections 6 and 9 of this Binder contain site surveys, which address the analysis of pipelines <br /> in proximity to the project, as well as the presence of any pesticides or herbicides. Both <br /> reports were prepared and approved for Tract 2924 and are re-used for Tract 2925. <br /> bIAJOR SUBDMSION-TRACT 2925 PROJECT DESCRIPaTeION <br />