Laserfiche WebLink
aX in <br /> xg in eering (916)366 -1466 <br /> F <br /> ix;10 tilx Ici<��i It<»ul. Islk (:r(y%'(% OtHrorifln 4M"(Q.34 <br /> Feb 5 , 1979 page 2 <br /> 4 . STREETS - continued <br /> Frontage Road No improvement- No d;_rect access except at <br /> street "B' and lot 1 . Lot 1 frontage to be improved with <br /> type A-3 60 foot R/W half street section without side- <br /> walk . <br /> Arch Road : <br /> a ) Standard A-3 street half section for 84 foot R/W with- <br /> out sidewalk . Stripe for one eastbound , two westbound , <br /> and one continuous left turn lane . <br /> b ) Use 50 foot common drives at the lot lines only . <br /> S . STORM DRAINAGE - <br /> Normal storm : <br /> a ) Property to' the east drains to the southeast corner of <br /> subject property and under Arch Road to the drainage <br /> channel south of Arch Rd . East boundary of the project <br /> will not be changed in elevation and will not adversly <br /> affect neighbors . <br /> b ) Property to the northeast is high and drains to North <br /> Littlejohn Creek . This project boundary will not be <br /> changed in elevation . <br /> c ) Property to northwest drains to northwest corner of <br /> project . Storm drain will be provided to drain this <br /> area :.to the existing 5 foot by 7 foot culvert under <br /> the freeway at station 183 +00 . <br /> d ) The 5 by . 7' freeway culvert will be cleaned for its <br /> entire length under the freeway . <br /> e ) Onsite drainage will be by underground pipe to storage <br /> ponds at the west end of the property . The ponds will <br /> drain by gravity and pump , if necessary , to existing <br /> 5 by 7 freeway culvert at station 183+00 , with shut <br /> off valves to prevent back flow from the ditch west <br /> of the freeway into the project , and to prevent drain- <br /> age from the project into that ditch while it is over- <br /> loaded by storm flow from other areas . <br /> f) All drainage facilities will be sized and designed per <br /> San Joaquin County slandards . <br /> 100 Year Storm : <br /> a) 100 year storm flows will flow through the project <br /> in the streets and parking lots . The eastern boundary <br /> of the project will not be raised or lowered . Present <br /> elevation is about 33 .0 . The 600 cfs flood will flow <br /> about 0 . 6 foot deep at 0 .4 feet per second velocity as <br /> it enters the project . <br />