My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2023 2:40:08 PM
Creation date
7/21/2022 10:35:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General Features of the Method <br /> T What type of test is the method conducting? (Check all applicable responses . ) <br /> 0 . 10 gal/hr Line Tightness Test <br /> 0 . 20 gal/hr Monthly Monitoring <br /> X 3 gal/hr Hourly <br /> 8 . Is the method permanently installed on the pipeline ? <br /> X yes ❑ no <br /> Does the method test the line automatically? <br /> X yes ❑ no <br /> If a leak is declared, what does the method do? (Check all applicable responses . ) <br /> X displays or prints a message <br /> X triggers an alarm <br /> X programmable alerts via Ethernet, serial, SMS , email -mail or internet <br /> X shuts down the dispensing system (can be programmed, but not required.) <br /> 9 . What quantity or quantities are measured by the method ? (Please list .) <br /> The system measures time and pressure loss within the <br /> primspace of the pipeline . <br /> 10 . Does the method use a preset threshold that is automatically activated or that automatically turns on an <br /> alarm? <br /> Xyes (If yes , skip question 11 . ) <br /> no (If no, answer question 11 . ) <br /> 11 . Does the method measure and report the quantity <br /> _ yes X no <br /> If so, is the output quantity converted to flow rate in gallons per hour? <br /> ❑ yes ❑ no <br /> 12 . What is the specified line pressure during a test? <br /> X operating pressure of line <br /> _ 150% of operating pressure <br /> _ a specific test pressure of psi <br /> Test Protocol <br /> 13 . What is the minimum waiting period required between a delivery of product to an underground storage <br /> tank and the start of the data collection for a pipeline release detection test? <br /> X no waiting <br /> _period less than 15 <br /> _min 15 min to 1 hr <br /> lto5hr <br /> 6 to 12 hr <br /> 12 to 24 hr greater <br /> than 24 hr <br /> variable (Briefly explain.) <br /> Pipeline Release Detection System Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.